Chapter 2
.
Getting Started
GFK-2847
Qui User’s Manual–November 2013
9
Chapter 2. Getting Started
This chapter contains information for performing a pre-installation check of your Qui
operator interface.
Before installing and using the Qui, the following steps should be completed:
■
Unpacking and Inspection
■
Basic Setup
■
Initial Startup
■
Runtime Setup
■
Firmware Updates
■
Shutdown
2.1 Unpacking and Inspection
Upon receiving your Qui operator interface carefully inspect all shipping containers
for damage. If any part of the system is damaged, notify the carrier immediately. The
damaged shipping container should be saved as evidence for inspection by the carrier. As
the consignee, it is your responsibility to register a claim with the carrier for damage
incurred during shipment. However, we will fully cooperate with you should such action be
necessary.
After unpacking the unit,
record all serial numbers
. Serial numbers are required if you need
to contact Customer Care during the warranty period. Shipping containers and packing
material should be saved in case it is necessary to transport or ship the unit.
Verify that all components of the system have been received and that they agree with your
order. If the system received does not agree with your order, contact Customer Care (see
“Contact Information” for phone numbers and email addresses).
Before you attempt to power up the operator interface for the first time, inspect the unit for
loose or damaged components. If damage is found (for example, in the form of bent
component leads or loose components), contact GE Intelligent Platforms for additional
instructions.
Do not
apply power to the unit if it has visible damage. Applying power to a unit with damaged
components could cause additional damage.
Содержание IC754CSL06MTD
Страница 5: ......
Страница 22: ...Chapter 4 Installation 22 QuickPanel User s Manual November 2013 GFK 2847 ...
Страница 35: ......