System
Cap
Backpulse
Tank
System
Base
Air Blad-
der Valve
Outlet port
Drain port
Inlet port
Air Relief
Valve
System
Casing
Uf 209 model shown.
all other models may be labeled similarly.
fiGUrE 4
UFC 207, UF 207, UFC 209, UF 209, UFC 211, and
UF 211
System (pre-assembled)
System Base
Advanced Plus Controller
Transformer (120VAC)
Carbon Prefilter for UFC 207, UFC 209, UFC 211
Stainless Steel Prefilter for UF 207, UF 209, UF 211
Two Stainless Steel Flex Hoses
Cap Wrench
Inside the bubble bag:
1 – Drain Solenoid Valve (Normally Closed)
1 – Air Relief Valve
1 – Nylon Elbow
3 – 3/8” bolts
2 – ¼” Mini Ball Valves with Plugs
3 – washers
3 – ¼” x 2 ½” anchors
3 – shims
2 – ¾” Inlet/Outlet Fittings
1- ½” Nipple
Surface Water Kit: (Optional)
1 – External Prefilter Housing
Mounting screws
1 – Wall Bracket Kit
1 – Check Valve
1 – ¼” Mini Ball Valve with Plug
4 – ½” Lag Bolts
1– Inlet Solenoid Valve (Normally Open)
1 – External Prefilter
cartridge (30-micron nominal)
•
Indoors with ambient temperature between 40
o
F-90
o
F
(4
o
C-32
o
C)
•
Drillable floor, patio stone, or wood base
•
Electrical outlet, 120VAC, within 10’ (305cm)
•
Existing water equipment (e.g. water softeners, filters
upstream and UV downstream)
•
Recommended household water pressure is 30 psi
minimum. If water pressure is less than 30psi, adjust
Backpluse Tank pressure. Refer to Step 4 in the
System installation
section.
•
Drain within 20’ (610cm) and up to 72” (183cm)
high. If the System is to be equipped with an Inlet
Solenoid Valve, the drain cannot be higher than the
drain port of the System for proper draining.
Note: All outlets downstream of the System will provide
filtered water. A dedicated line, diverted from the main
water line, is recommended to be installed upstream of the
System for all exterior taps, pool or hot tub makeup valves,
and irrigation systems. This set-up will help prolong the life
of the System membrane.
Horizontal Mounting Kit: (Optional)
2 – Cast Iron Stands
2 – Cast Iron Cross
Members
1 – Metal Support Strap 1 – Air Relief Valve
1 – Brass ½” Elbow
1 – Brass ¼” Tee
1 – Brass ½” Plug
1 – Foam gasket
1 – PVC ½” Nipple at 2” long
1 – Brass ½” x ¼” Reducer Elbow
1 – Polypropylene ¼” Close Nipple
1 – Polypropylene ½” Close Nipple
1 – Concrete floor bolt
4 – Wall mounting bolts 2½” long
3 – ¼” x 1” bolt & lock nut
5 –
5
/
16
” x 1¼” bolt & lock nut
Horizontal mounting
If this installation requires the System to be installed hori-
zontally, complete the steps described in this section. If the
System is to be installed in a vertical orientation, go to the
System installation
section.
The Horizontal Mounting Kit is purchased separately and can
only be installed with UFC 207, UF 207, UFC 209, UF 209, UFC
211, and UF 211 models. The Horizontal Mounting Kit must
be used in the installation of Horizontally-mounted Systems.
UFC 100, UF 100, and UF 100 with optional Surface
Water Option Kit models cannot be installed horizontally.
Pre-installation inspection
Prior to beginning the installation, check for the following:
•
Space near point of entry of water supply
•
Footprint and Height Clearance:
Vertical Systems
Footprint:
minimum18”x18” (46cm x 46cm)
Height clearance:
UFC 207, UF 207 - minimum 68” (173cm)
All others - minimum 74” (188cm)
Horizontally-mounted Systems
Footprint (including 14” (36cm) of clearance beyond the
System Cap:
UFC 207, UF 207 - minimum 24” x 68” (61cm x 173cm)
All others - minimum 24” x 74” (61cm x 188cm)
Height clearance:
minimum 36” (91cm)
•
All Systems - level area (for floor mounting)
Part identification
Preparing for installation
7