Before placing the generator system into service, inspect the
entire installation carefully.
Complete the ”Installation Checklist” as you make the
inspection. Ensure all items have been filled-in and all
signatures have been obtained. Instruct the owner to mail
the white copy to the address shown on the checklist.
This completes the installation and start-up instructions.
The operator’s manual provides full details on Operation,
Maintenance and Troubleshooting for this generator system.
installation inspection
is a trademark of General Electric Company
and is under license by Briggs & Stratton
Power Products Group, LLC.
Copyright © 2010. All rights reserved. No part of this material may
be reproduced or transmitted in any form without the express
written permission of Briggs & Stratton Power Products Group, LLC.
The exercise cycle may be discontinued at anytime by
turning the System Switch to OFF.
3. The unit will then start and run it’s 20 minute exercise
cycle.
For example, if you press SET EXERCISE on Sunday morning
at 10:00 AM, the unit will run an immediate exercise cycle
and an exercise cycle every following Sunday at 10:00 AM
(+/- 1/2 hour).
“Set Exercise” will only work if the unit is in the AUTO mode
and this exact procedure is followed. The exerciser will need
to be re-set if the 15 Amp fuse is removed or changed, or if
the starting battery is disconnected.
If you want to change the day and time the unit exercises,
simply perform the “Set Exercise” procedure at the exact
weekday and time you want it to take place.
Generator will not exercise if timer is not set.