28
Before placing the generator system into service, inspect the
entire installation carefully.
Complete the ”Installation Checklist” as you make the
inspection. Ensure all items have been filled-in and all
signatures have been obtained. Instruct the owner to mail
the white copy to the address shown on the checklist.
This completes the installation and start-up instructions.
The operator’s manual provides full details on Operation,
Maintenance and Troubleshooting for this generator system.
installation inspection
is a trademark of General Electric Company
and is under license by Briggs & Stratton
Power Products Group, LLC.
Copyright © 2010. All rights reserved. No part of this material may
be reproduced or transmitted in any form without the express
written permission of Briggs & Stratton Power Products Group, LLC.
Not
for
Reproduction