Chapter 2 Pre-Installation
2-11
Section 2-3
Facility Needs
2-3-1
Purchaser Responsibilities
The work and materials needed to prepare the site is the responsibility of the purchaser. Delay,
confusion, and waste of manpower can be avoided by completing pre installation work before delivery.
Use the Pre installation checklist to verify that all needed steps have been taken. Purchaser
responsibility includes:
•
Procuring the materials required.
•
Completing the preparations before delivery of the LOGIQworks.
•
Paying the costs for any alterations and modifications not specifically provided in the sales contract.
The desire to use a non–listed or customer provided product or to place an approved product further
from the workstation than the interface kit allows presents challenges to the installation team. To avoid
delays during installation, such variances should be made known to the individuals or group performing
the installation at the earliest possible date (preferably prior to the purchase).
The workstation suite must be clean prior to delivery of the machine. Carpet is not recommended
because it collects dust and creates static. Potential sources of EMI (electromagnetic interference)
should also be investigated before delivery. Dirt, static, and EMI can negatively impact system reliability.
2-3-2
Required Features
•
Dedicated single branch power outlets of adequate amperage (see
) meeting all local
and national codes which is located less than 1.5 m (5 ft.) from the workstation’s proposed location.
•
Proposed location for the workstation is at least 0.3 m (1 ft.) from the wall for cooling.
•
Power outlet and place for any external peripheral are within 2 m (6.6ft) of each other with peripheral
within 1 m of the unit to connect cables.
•
Power outlets for test equipment within 1 m (3.3 ft.) of PC.
•
Either an Analog Phone Line, or a GE Approved Broadband/VPN connection, is required for iLinq.
A functional LAN is required for Network connectivity.
•
An Ethernet network wall jack is required.
2-3-3
Desirable Features
•
Circuit breaker for dedicated power outlet is easily accessible.
•
Dual level lighting (bright and dim).
•
Lockable cabinet ordered by GE for its software and proprietary manuals.
WARNING
WARNING
All electrical installations that are preliminary to the positioning of the equipment at the site prepared for
the equipment must be performed by licensed electrical contractors. Other connections between pieces
of electrical equipment, calibrations, and testing must also be performed by qualified personnel. The
products involved (and the accompanying electrical installations) are highly sophisticated and special
engineering competence is required. All electrical work on these products must comply with the
requirements of applicable electrical codes. The purchaser of GE equipment must only utilize qualified
personnel to perform electrical servicing on the equipment.
Содержание H49021AA
Страница 2: ......
Страница 9: ...GE HEALTHCARE DIRECTION 5184024 100 REVISION 5 LOGIQWORKS BASIC SERVICE MANUAL vii ...
Страница 418: ...GE MEDICAL SYSTEMS DIRECTION 5184024 100 REVISION 5 LOGIQWORKS BASIC SERVICE MANUAL II ...
Страница 419: ......