GE H
EALTHCARE
D
IRECTION
5394152,
Revision 5
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Chapter 8 -
Page 8-55
8-2-19
Top Bottom Cover
8-2-19-1
Tools
•
Common Phillips screwdrivers
•
Stubby screwdriver (Flat tip and Cross tip)
8-2-19-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-19-3
Removal procedure
1.) Remove the Dummy Cover L/R. Refer to the
8-2-23 "Dummy Cover L / R" on page 8-61
2.) Unscrew 7 screws (1-7) from the bottom of the top cover.
3.) Remove the Top Bottom Cover.
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-19-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-94 Top bottom cover
Table 8-20 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394152, Rev 1+, Section 8-2-19. Equipment
passed all required tests and is ready for use. “