background image

Batteries 

 

GFK-2741C 

March 2015 

13 

2.7

 

Battery Installation Instructions 

 

 

Warning 

Explosion Hazard - Do not add, remove, replace or recharge a battery unless the area is 
known to be non-hazardous. 

 

2.7.1

 

Installation in Hazardous Areas 

1.

 

Install the CPU in a system that is located 

outside

 the hazardous area. 

2.

 

Apply power to the system and install the battery. 

3.

 

Power the system down. 

4.

 

With the battery still attached, remove the CPU and install it in the system that is located in the hazardous area. 

2.7.2

 

Preparation and Mounting 

 

If installing an auxiliary battery (IC693ACC302 or IC695ACC302), securely mount the battery to the panel 
mounting surface before attempting to connect the battery to the CPU. For mounting instructions, see the 
previous sections. 

 

If using a Smart Battery (IC698ACC701C or later, or IC695ACC302), connect the Enabling Cable to the Battery 
using the 4 pin connectors.  

Note: 

Disconnect the enabling adapter cable from the battery pack when the battery is not attached to a CPU 
(when the enabling adapter cable is connected, the battery drains to support the smart circuitry, even if 
it is not attached to the CPU).

 

 

If using the rechargeable battery (IC690RBT001), securely mount the battery and its charger (IC690CRG001) to 
the panel mounting surface before attempting to connect the battery to the CPU. For mounting instructions, 
see the previous sections. Insert the charging jack into the threaded connector on the side of the battery and 
hand-tighten the screw lock to secure it. 

2.7.3

 

Installation and Replacement 

1.

 

Access the battery compartment on the CPU by opening the door (RX3i) or removing the battery cover (RX7i) - 
(refer to the battery installation figures below) 

2.

 

Turn on power and wait for the CPU to complete its initialization. Initialization is complete when the OK LED on 
the CPU remains on.  

3.

 

Connect the battery to either of the battery connectors on the CPU. If replacing an existing battery, connect the 
new battery to the other connector before disconnecting the old battery (be careful to not disconnect the old 
battery until the new battery is connected). Properly discard the old battery per the disposal instructions (See 

Safe Handling & Disposal

). 

4.

 

For Coin Cell batteries, secure the battery in the compartment and close the compartment door (RX3i) or install 
the battery cover (RX7i). 

5.

 

For auxiliary batteries and the rechargeable battery, route the battery cable through the notch in the base of 
the battery compartment (RX3i) or the slot in the bottom of the battery cover (RX7i) and close the compartment 
door (RX3i) or install the battery cover (RX7i).  
Be careful not to pinch the battery cable when closing the battery compartment cover. 

 

Содержание GFK-2741C

Страница 1: ...GE Intelligent Platforms Programmable Control Products PACSystems Controllers Battery and Energy Pack Manual GFK 2741C March 2015 ...

Страница 2: ...uded herein Changes modifications and or improvements to equipment and specifications are made periodically and these changes may or may not be reflected herein It is understood that GE may make changes modifications or improvements to the equipment referenced herein or to the document itself at any time This document is intended for trained personnel familiar with the GE products referenced herei...

Страница 3: ...is unavailable Technical Support Email support ip ge com Customer Care Email customercare ip ge com Primary language of support English Europe the Middle East and Africa Online Technical Support www ge ip com support Phone 800 1 433 2682 EMEA Direct Dial 420 23 901 5850 if toll free 800 option is unavailable or dialing from a mobile telephone Technical Support Email support emea ip ge com Customer...

Страница 4: ...s 8 2 5 Rechargeable Batteries 9 2 5 1 IC690RBT001 9 2 5 1 1 Specifications 9 2 5 1 2 Nominal Battery Life 9 2 5 1 3 Battery Mounting 9 2 5 1 4 CPU Battery Low Indication 10 2 5 1 5 Diagnostics 10 2 5 2 IC690CRG001 10 2 5 2 1 Specifications 10 2 5 2 2 Operation 10 2 5 2 3 Indicators 10 2 5 2 4 Charger Connection 11 2 6 Legacy Batteries 11 2 6 1 IC698ACC701A and IC698ACC701B 11 2 6 1 1 Specificatio...

Страница 5: ...Cable Connections 20 3 2 5 1 Connecting Input Power to the Energy Pack 20 3 2 5 2 Connecting the Energy Pack to the Controller 21 3 2 6 Grounding 21 3 2 7 Power up 22 3 2 8 LED Indications 22 3 2 8 1 LED Indications Special Cases 22 3 2 9 Backup Operation 22 3 2 10 Service and Maintenance 23 3 2 10 1 Replacing the Cap Pack Module 23 3 2 10 2 Firmware Updates 23 3 2 11 Diagnostics 24 3 2 11 1 Syste...

Страница 6: ...n technologies in passing However when it comes to energy sources used by PACSystems to back up volatile memory this manual should be considered the definitive source Other methods of retaining volatile memory such as real time clock batteries are not covered by this manual Note however that RX7i CPUs use the same battery mechanism to back up the calendar clock and user memory This manual includes...

Страница 7: ...Introduction 2 PACSystems Controllers Battery and Energy Pack Manual GFK 2741C ...

Страница 8: ...sadvantages are reduced memory retention time as compared to conventional batteries and limited CPU compatibility For CPUs that do not support low battery detection the conventional coin cell lithium battery may be a better choice as it will provide longer retention time 2 1 4 Smart Auxiliary Lithium Battery IC695ACC302 The smart auxiliary lithium battery is an improvement on the conventional auxi...

Страница 9: ...04 40 30 15 15 175 160 15 200 90 IC698CPE030 Hx and earlier 235 30 14 IC698CPE030 Jx and later 23 8 15 30 14 IC698CRE030 Gx and earlier 235 30 14 IC698CRE030 Hx and later 23 8 15 30 14 IC698CPE040 Hx and earlier 235 30 14 IC698CPE040 Jx and later 23 8 15 30 14 IC698CRE040 Gx and earlier 235 30 14 IC698CRE040 Hx and later 23 8 15 30 14 1 IC695CPE305 IC695CPE310 IC695CPE330 do not appear in this tab...

Страница 10: ...hardware and firmware versions IC698CPE0204 all hardware and firmware versions IC698CRE0204 all hardware and firmware versions IC698CPE030 Jx and later hardware revisions with firmware revision 6 75 or later IC698CPE040 Jx and later hardware revisions with firmware revision 6 75 or later IC698CRE030 Hx and later hardware revisions with firmware revision 6 75 or later IC698CRE040 Hx and later hardw...

Страница 11: ... left for CPU RAM retention during power loss Since the low battery period may start while the PLC is powered down and faults cannot be logged in this state the low battery fault date is unlikely to indicate the starting point of the 15 day count down System power downs should not exceed 15 days as the battery voltage may drop to 0V resulting in the loss of CPU RAM memory contents Consider the fol...

Страница 12: ...urs first 2 4 2 1 Specifications Parameter Specification Battery capacity 15 0 Amp hours Lithium content 5 1 grams 3 cells 1 7 grams cell Physical dimensions 5 713 long x 2 559 wide x 1 571 high 145 1 x 65 0 x 39 9 mm Weight 224 grams Case material Black flame retardant ABS plastic Connection 2 50mm twisted red black 22 AWG cable with female two pin connector compatible with the battery connector ...

Страница 13: ... with only that specific CPU model for the remainder of its life to insure proper Low Battery indication IC698ACC701C smart coin cell battery packs should be replaced every 2 years or once a Low Battery fault is logged in the CPU whichever occurs first 2 4 3 1 Specifications Parameter Specification Battery capacity 3 0 Amp hours Lithium content 0 87 grams 3 cells 0 29grams cell Physical dimensions...

Страница 14: ...life is negatively affected by higher temperatures and can be significantly improved by operating closer to room temperature 25ºC When deciding where to mount the battery consider how the mounting location will affect the battery temperature For most industrial installations mounting the battery below the PLC rack will result in a temperature closer to 25ºC and will help improve battery life Do no...

Страница 15: ...ure range 0 to 60ºC 2 5 2 2 Operation Charging begins when a battery pack is connected to the charger The LED is initially orange and changes to red when the fast charge starts When the cells are fully charged the charger goes into top off charge mode before switching to trickle charge mode During the top off charge the LED is green with short intermittent orange flashes When the top off charge is...

Страница 16: ... the low battery detection feature Due to the limited capacity of this battery pack it is not compatible with all PACSystems CPUs Please refer to the Battery Compatibility and Memory Retention Time in Days at 20 C chart for CPU compatibility information 2 6 1 1 Specifications Parameter Specification Battery capacity 3 0 Amp hours Lithium Li content 0 87 grams 3 cells 0 29grams cell Physical dimens...

Страница 17: ...tern shown in the following figure Use care to keep metal chips from falling into other equipment Securely attach the Auxiliary Battery Module to the panel mounting surface using four 8 32 x flat head machine screws 5 253 133 43 mm 1 746 44 35 mm 8 32 four places 2 6 2 3 CPU Battery Low Indication The IC693ACC302 Auxiliary Battery module will not reliably provide the CPU with a battery low indicat...

Страница 18: ...1 to the panel mounting surface before attempting to connect the battery to the CPU For mounting instructions see the previous sections Insert the charging jack into the threaded connector on the side of the battery and hand tighten the screw lock to secure it 2 7 3 Installation and Replacement 1 Access the battery compartment on the CPU by opening the door RX3i or removing the battery cover RX7i ...

Страница 19: ...m RX7i Battery Installation Diagram 1 Notch at base of battery compartment Connectors 2 An earlier version RX7i CPU may not have a slot in its battery door For these CPUs replace the door supplied with the IC698ACC701 replacement battery Connectors Battery Compartment Notch in Battery Cover Battery Compartment ...

Страница 20: ...cable attached Legacy Coin Cell IC698ACC701 A B 5 years 20 C Smart Coin Cell IC698ACC701 C and later 5 years 20 C without the enabling adapter cable attached Legacy Auxiliary IC693ACC302 7 years 20 C Rechargeable IC690RBT001 3 years 20 C 2 9 Safe Handling Disposal Warning Batteries may present a risk of fire explosion or chemical burn if mistreated Do not crush disassemble short circuit or dispose...

Страница 21: ...stallation requirements of that module 2 10 1 Batteries These products are UL Listed Accessories for the PACSystems RX3i and RX7i family of PLCs and have been evaluated to the following standards for use in ordinary and hazardous areas UL 2054 ANSI ISA 12 12 0 1 UL File E157515 In addition IC690RBT001 has been evaluated to IEC62133 2 10 2 Charger IC690CRG001 This product is a UL Recognized Compone...

Страница 22: ...atible Compatible Incompatible 3 2 PACSystems RXi Energy Pack ICRXIACCEPK01A 3 2 1 Specifications Part Numbers ICRXIACCEPK01A Energy Pack Includes base Cap Pack module and Energy Pack to Controller cable ICRXIACCCPK01A Replacement Cap Pack module ICRXIACCCBL01A Replacement 0 3m 12 Energy Pack to Controller cable Functional Specifications Dimensions 114 05 77 47 63 75 mm 4 49 3 05 2 51 Input voltag...

Страница 23: ...ronment Installations For use in industrial environments this product is considered open equipment having live electrical parts that may be accessible to users and must be installed in an ultimate enclosure that is manufactured to provide safety As a minimum the enclosure shall provide a degree of protection against solid objects up to 12mm e g fingers This equates to a NEMA UL Type 1 enclosure or...

Страница 24: ...imum clearance of 25 4mm 1 inch on the four sides of the unit right left top and the bottom Recommended fasteners Four M4 0 7 machine screws with minimum length of 25mm or 8 32 1 min length and nuts 1 Drill four mounting holes using the spacing shown in the following drawing 2 Use the machine screws and nuts to attach the Energy Pack to the panel 2 610 66 294mm 4 070 103 378mm 0 188 4 763mm Drilli...

Страница 25: ...lating secondary circuit Power Supply Requirements When the Energy Pack is powered by an LPS Class 2 or a Limited Voltage Current power source no additional over current protection is required Otherwise power supply branch circuit overcurrent protection of no more than 20 A with a readily accessible disconnect is required along with supplementary protection ranging from 4 to 7 amps on the output o...

Страница 26: ...n With power to the system turned off use the supplied cable or a user supplied cable 1 m maximum length to connect the output of the Energy Pack green connector to the 24Vdc input on the Controller orange connector 3 2 6 Grounding Proper grounding of this device is essential All ground wires must be as short as possible and terminate at the same grounding point Earth Ground Central Ground Point F...

Страница 27: ...of Cap Pack is in progress No fault exists Green solid Cap Pack is fully charged and no fault exists Amber blinking Cap Pack is nearing end of life The Cap Pack must be replaced soon Backup is still guaranteed Red blinking Internal fault Cycle power to the Energy Pack If this does not clear the fault contact Technical Support and replace the Energy Pack Red solid Cap Pack has reached end of life R...

Страница 28: ... the Cap Pack into place Caution Over tightening the mounting screws could crack the plastic housing 3 Use the four screws provided to secure the Cap Pack to the base 4 When the Cap Pack is first inserted the STAT LED blinks green while the Cap Pack is charging Do not remove power to the Energy Pack while the Cap Pack is charging because this could result in Controller memory not being preserved 5...

Страница 29: ...n for this Energy Pack are listed in LED Indications 3 2 12 Agency Certifications The following table lists the standards to which the Energy Pack has been certified Description Agency Standard or Marking Comments N A Safety for Information Technology Equipment Certification by Underwriter s Laboratories to UL 60950 1and CSA 60950 1 N A Safety for Industrial Control Equipment Certification by Unde...

Страница 30: ... PACSystems RX3i System Manual GFK 2314 PACSystems RX3i Energy Pack IC695ACC400 IPI GFK 2724 PACSystems RX3i Energy Pack IC695ACC402 Quick Start Guide GFK 2939 PACSystems RXi Distributed IO Controller User s Manual GFK 2816 For user manuals product updates and other information go to the Support website http www ge ip com support and refer to Controllers and IO ...

Страница 31: ... available on our web site www ge ip com Additional Resources For more information please visit the GE Intelligent Platforms web site www ge ip com 2013 2015 GE Intelligent Platforms Inc All Rights Reserved Trademark of GE Intelligent Platforms Inc All other brands or names are property of their respective holders GFK 2741C ...

Отзывы: