6
Safety Requirements
GE Factory Service Employees are required to use safety glasses with side shields, safety gloves and steel toe
shoes for all repairs.
Steel Toed Work Boot
Electrically Rated Glove and
Dyneema® Cut Resistant Glove
Keeper
Dyneema® Cut Resistant Glove
Cut Resistant Sleeve(s)
Plano Type Safety Glasses
Prescription Safety Glasses
Safety Glasses must be ANSI
Z87.1-2003 compliant
Brazing Glasses
WARNING
Prior to disassembly of the front load dryer to access components, GE Factory Service technicians are RE-
QUIRED to follow the Lockout/Tagout (LOTO) 6 Step Process:
Step 1
Plan and Prepare
Step 4
Apply LOTTO device and lock
Step 2
Shut down the appliance
Step 5
Control (discharge) stored energy
Step 3
Isolate the appliance
Step 6
“Try It” verify the appliance is locked out