Check Item
1
The inverter is firmly installed at a clean place where is well-ventilated and easy-to-
operate.
2
The PE cable, DC input cable, AC output cable, and communication cable are
connected correctly and securely.
3
Cable ties are routed properly and evenly, and no burrs.
4
Unused ports and terminals are sealed.
5
The voltage and frequency at the connection point meet the on-grid requirements.
Check Items Before Switching Power ON
High voltage hazard. Power
off the inverter first before any
operations.
Potential risks exist. Wear
proper PPE before any
operations.
Read through the guide before
any operations.
Delayed discharge. Wait until
the components are totally
discharged after power off.
High temperature hazard. Do
not touch the equipment to
avoid being hurt.
N/A
N/A
5min