GE Multilin
G30 Generator Protection System
7-9
7 COMMANDS AND TARGETS
7.1 COMMANDS
7
•
Latched target message
: No.
•
Description of problem
: One or more GOOSE devices are not responding.
•
How often the test is performed
: Event driven. The test is performed when a device programmed to receive GOOSE
messages stops receiving. This can be from 1 to 60 seconds, depending on GOOSE packets.
What to do
: Check GOOSE setup.
•
Latched target message
: Yes.
•
Description of problem
: The ambient temperature is greater than the maximum operating temperature (+80°C).
•
How often the test is performed
: Every hour.
•
What to do
: Remove the G30 from service and install in a location that meets operating temperature standards.
•
Latched target message
: Yes.
•
Description of problem
: Abnormal restart from modules being removed or inserted while the G30 is powered-up, when
there is an abnormal DC supply, or as a result of internal relay failure.
•
How often the test is performed
: Event driven.
•
What to do
: Contact the factory.
•
Latched target message
: Yes.
•
Description of problem
: A link loss detection on an Ethernet port. The link loss is due to unplugging the cable or the
switch port being down.
•
How often the test is performed
:
•
What to do
: Check the connection.
•
Latched target message
: No.
•
Description of problem
: The number of failures threshold was exceeded.
•
What to do
: Wait for the lockout interval and try to authenticate again.
REMOTE DEVICE FAIL:
COMM Path Incomplete
TEMP MONITOR:
OVER TEMPERATURE
UNEXPECTED RESTART:
Press “RESET” key
FIRST ETHERNET FAIL
SECOND ETHERNET FAIL
THIRD ETHERNET FAIL
AUTHENTICATION FAIL
Содержание G30
Страница 10: ...x G30 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 G30 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 414: ...5 274 G30 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 456: ...8 2 G30 Generator Protection System GE Multilin 8 1 DIRECTIONAL PRINCIPLE 8 THEORY OF OPERATION 8 ...
Страница 470: ...9 14 G30 Generator Protection System GE Multilin 9 1 SETTING EXAMPLE 9 APPLICATION OF SETTINGS 9 ...
Страница 484: ...11 12 G30 Generator Protection System GE Multilin 11 6 DISPOSAL 11 MAINTENANCE 11 ...
Страница 512: ...A 28 G30 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Страница 620: ...B 108 G30 Generator Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Страница 666: ...E 10 G30 Generator Protection System GE Multilin E 1 IEC 60870 5 104 APPENDIX E E ...
Страница 678: ...F 12 G30 Generator Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Страница 687: ...GE Multilin G30 Generator Protection System H 7 APPENDIX H H 2 ABBREVIATIONS H Z Impedance Zone ...