FVP 110 Fieldbus Valve Positioner Manual
54
GE Energy
Wiring
CAUTION
For flameproof equipment, wiring materials and wiring work
for this equipment including peripherals are strictly restricted.
Read “Installation and Operating Precautions for JIS
Flameproof Equipment” prior to the work.
Recommended Cables
For wiring for a FVP110:
❑
Use a cable for H1 fieldbus segments specified by the Fieldbus FOUNDATION™.
A shielded cable is recommended. For the details of cables required for H1
fieldbus segments, see
Fieldbus Technical Information
(TI 38K3A01-01).
❑
Choose cables suitable for the respective ambient temperature ranges, especially
when they are to be laid in a hot or cold place.
❑
Laying cables in or through a place where the atmosphere may include a toxic gas
or liquid, or oil or solvent requires wires and cables made of sufficient durability.
❑
Prevent the cables from being affected by noise induced from a high-capacity
transformer or power supply to a motor.
❑
Make the cables and connection adapters watertight and prevent the cables from
being damaged by using a cable conduit and duct.
General-use Type and Intrinsically Safe Type
1. Remove the terminal box cover and dust proofing plug (Figure 33). Be sure to
securely seal the unused wiring port with a blind plug.
Figure 33
Wiring
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......