
SECTION 26 (Continued)
10. Select the appropriate cylinder
(Note: For maximum accuracy
and safety, select the cylinder
that displays the largest
utilization range.)
11. Enter the Process Pressure.
12. Ensure there is no load on the
load cell and activate the
Zero
Force
action button on the test
screen.
Testing can begin by either pressing the space bar on the keyboard or by slowly
pumping the hand pump.
EVT PRO 2.0
®
PERFORMING A TEST
EVT PRO 2.0
®
Operations and Technical Manual (Rev 1.0
– 2016)
NOT FOR COPY OR DISTRIBUTION
Page 31
Содержание EVT-Pro 2.0
Страница 10: ...EVT PRO 2 0 Operations and Technical Manual Rev 1 0 2016 NOT FOR COPY OR DISTRIBUTION Page 6 ...
Страница 11: ...EVT PRO 2 0 Operations and Technical Manual Rev 1 0 2016 NOT FOR COPY OR DISTRIBUTION Page 7 ...
Страница 57: ...APPENDIX INFORMATION EVT Pro 2 0 Operations and Technical Manual Rev 1 0 2016 ...