background image

[EN]  English - K0454 Issue 1

Installation   

7

5

Installation

 Before you start:

Read and understand the “Safety” section.

Do not use damaged equipment.

Note: 

Use only original parts supplied by the manufacturer.

5.1 AMC battery

See figure A3 (front cover).

5.2 Indicator 

assembly

Optional item (

MC 620

/

PM 620

)

. See figure B2 (front cover).

5.3 Electrical 

connections

See figure C1 to C5, and D1 (front cover).

5.4 External pressure 

connections

See figure B1/E1 (front cover). Use an applicable method to 
seal the external pressure connections, and then tighten to the 
applicable torque. Maximum torque:

1/8 NPT: 35 Nm (26 lbf.ft)

G1/8: 25 Nm (18.4 lbf.ft)

A3

Step

Procedure

1.

When the power is off, loosen the five screws (a) and remove 
the cover (b).

If necessary, turn the instrument over and let the discharged 
battery drop into your hand.

2.

Install the new battery correctly until it is flat in the 
compartment.

3.

Re-attach the cover.

B2

Step

Procedure

1.

Align the two slots (a) on the calibrator with the two posts (b) on 
the module carrier.

2.

When the posts are fully engaged in the slots, tighten the two 
screws until they are hand tight.

3.

Attach one or two PM 620 modules with the correct range and 
type. 

4.

Tighten each one until it is hand tight only. 

Содержание Druck DPI 620

Страница 1: ...S Figure C4 k 300 Vac AC probe Figure C5 Part IO620 AC A1 2 DPI 620 Channel 2 CH2 l 30 V M m 2000 mV M n 55 mA M Figure D1 o 0 to 24 mA S p 24 V loop P q Switch M A1 3 DPI 620 MC 620 PM 620 Pressure...

Страница 2: ...12 f c e 11 b a d b 2 a 1 a 2 2 1 1 3 3 5 4 a b 2 4 3 1 C1 DPI 620 CH1 C2 DPI 620 CH1 C3 DPI 620 CH1 C4 DPI 620 CH1 C5 DPI 620 CH1 E1 DPI 620 MC 620 PM 620 C 4 D1 DPI 620 CH2 A1 1 a b c d e f V mV Hz...

Страница 3: ...is dangerous to ignore the specified warnings Start operations S1 to S4 S1 Install the battery Refer to Section 5 S2 Power on off sequence S3 Example change of function Voltage to Current ON First dis...

Страница 4: ...ximise minimise set voltage Menu sequence Task Settings CH1 CH2 Channel Settings Function Units Utility Caption Select Function None Current Voltage A channel can only have one function at a time TAP...

Страница 5: ...ic or hydraulic pressures you can have up to two interchangeable pressure transducers at a time Pressure modules PM 620 Optional item These modules attach to the pressure module carrier MC 620 or to a...

Страница 6: ...tween the terminals and the ground earth To prevent electrical shocks use only the GE specified AC probe Part IO620 AC to measure AC voltages maximum 300 Vac This instrument uses a Lithium Polymer Li...

Страница 7: ...figures on the front cover A2 B1 4 1 Key to figure A2 DPI 620 calibrator Complies with European Union directives Warning refer to the manual Read the manual USB ports Type A Mini type B connector Grou...

Страница 8: ...he display is set by the number of task selections and external modules you are working with maximum 6 12 Tap this button to set up the Task set up the instrument Configure and to access Help Refer to...

Страница 9: ...onnections and then tighten to the applicable torque Maximum torque 1 8 NPT 35 Nm 26 lbf ft G1 8 25 Nm 18 4 lbf ft A3 Step Procedure 1 When the power is off loosen the five screws a and remove the cov...

Страница 10: ...ay with touch screen Operating temperature 10 to 50 C 14 to 122 F Storage temperature 20 to 70 C 4 to 158 F Ingress Protection IP65 DPI 620 calibrator only Humidity 0 to 90 relative humidity RH non co...

Страница 11: ...Customer service Visit our web site www gesensing com...

Отзывы: