GE Disposall GFC300F Series Скачать руководство пользователя страница 7

7

LOCK MOUNT RING

Turn the mount ring to the right until it locks up

tight. Hopper projections must be to the extreme

left of the mounting slots. If the mount ring is

hard to turn, you may add a small amount of

petroleum jelly or liquid soap to the hopper

projection. Run water and check for leaks.

3

Installation Instructions

Hopper Projection in
“Supported” Position

Hopper Projection in
“Locked” Position

Mount
Ring

Locking Detail

Check the unit for leaks 24 hours after installation

and first operation.

CHECK FOR LEAKS

4

CONNECTING DISPOSER TO SINK FLANGE

4

Line up the disposer

under the sink flange.

Guide the hopper

projections into the

mount ring slots. Turn

the mount ring about

1/4

to the right so 

that the disposer is

temporarily supported.

1

Turn the mount ring and the disposer until the

disposer discharge elbow lines up with the outlet

pipe (see page 8).

LINE UP WITH OUTLET PIPE

2

Mount
Ring Slot

Hopper
Projection

Discharge
Elbow

Outlet Pipe

ATTACH TO SINK FLANGE

Содержание Disposall GFC300F Series

Страница 1: ...nnecting Disposer to Sink Flange 7 Dimensions Typical Installations 8 Dishwasher Connection 6 Operating Instructions Batch Feed Models 9 Care and Maintenance 10 Continuous Feed Models 9 Troubleshootin...

Страница 2: ...oser leave the drain stopper in place to reduce the risk of objects falling into the disposer For proper grounding instructions see the ELECTRICAL CONNECTION portion of this manual 2 Consumer Support...

Страница 3: ...Your Disposer Directly into the House Current GROUNDING INSTRUCTIONS This appliance must be connected to a grounded metal permanent wiring system or an equipment grounding conductor must be run with t...

Страница 4: ...tion of this appliance requires basic mechanical skills Completion time 1 hour Proper installation is the responsibility of the installer Product failure due to improper installation is not covered un...

Страница 5: ...ge will not move At this point you may want to insert the stopper in the sink and fill with water to check the sink flange seal and insure there are no leaks H Place the mount ring over the sink flang...

Страница 6: ...UIRED If you are connecting to a dishwasher complete the following step If a dishwasher is not to be connected go on to Attaching the Discharge Elbow section 1 Connect the dishwasher hose using a hose...

Страница 7: ...Locked Position Mount Ring Locking Detail Check the unit for leaks 24 hours after installation and first operation CHECK FOR LEAKS 4 CONNECTING DISPOSER TO SINK FLANGE 4 Line up the disposer under the...

Страница 8: ...020F 11 2 11 2 11 2 59 16 71 4 81 2 161 16 71 4 81 2 59 16 141 2 615 16 53 8 73 4 137 16 41 2 41 2 41 2 GFB760F Batch Feed Operation 11 2 93 8 81 2 59 16 165 8 41 2 11 2 59 16 93 8 81 2 183 16 41 2 GF...

Страница 9: ...hat make a clicking sound as they swing into place This indicates normal operation Batch Feed Models A Remove the sink stopper and turn on a medium flow of cold water B Scrape in food waste C Insert t...

Страница 10: ...ma bean pods and corn husks require considerable cutting time For this reason you may prefer to place them in the trash can or trash compactor Operating instructions Care and maintenance THE MOTOR IS...

Страница 11: ...freely check for an object lodged between the turntable and the grind ring Dislodge the object by moving the turntable with a broom handle Then remove the object If no foreign object is present there...

Страница 12: ...r year extended limited original purchase warranty period you will be responsible for all installation charges relating to the replacement disposer Additional Six Years Models GFC1020F GFB1060F If the...

Отзывы: