General System Requirements
1.2 Customer Responsibilities
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
1-2
1.2 Customer Responsibilities
It is the customer’s responsibility to prepare the site in accordance with all the specifications
provided in this manual, and in conjunction with the site-specific drawings. It is essential to verify
all aspects of the site configuration before construction is started, as subsequent changes can be
costly or impractical.
A detailed checklist is provided in
. It is the customer’s responsibility to
ensure that all requirements in the checklist are fulfilled and that the site conforms with all the
specifications and requirements in this manual.
The customer is responsible for all aspects of site preparation, including, but not limited to, the
following tasks:
Assigning a project coordinator (see
)
Planning and construction or renovations required for installation of the system, in accordance
with the specifications included in this manual, including:
Room Size, Layout and Considerations, p.2-11
Equipment Description and General Construction Requirements, p.2-1
Special Construction Requirements, p.3-1
Environmental HVAC Requirements, p.4-1
Electrical Requirements, p.5-1