Electrical Requirements
5.8 Power Line Outlets for Service
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
5-20
5.8 Power Line Outlets for Service
It is recommended to install at least two standard power outlets in the scan room and in the
operator room, to be used for electrically powered service tools. The exact location of these outlets
should be defined according to regulatory and service clearances around the system.