GE H
EALTHCARE
D
IRECTION
2307224-100, R
EVISION
6
D
ISCOVERY
LS S
YSTEM
S
ERVICE
M
ANUAL
Page 126
Chapter 6 - Table
6.2.5.7 Disconnect and Discard the CT-PET Positions Cable (P/N 2318721)
The ETC I/F J8 connection consists of three cables and a pigtail. Two cables go to the PET and CT
limit switches, and one cable goes to the Gantry. The pigtail connects all the signals to the ETC I/F
Board. Follow the instructions in this section to remove the pigtail and the PET and CT limit switch
cables.
Note:
For best results, tilt the ETC mounting tray to access the connectors. Use a flat-blade screwdriver
to unfasten the slotted (captive) screw located bottom center.
1.) Cut the tie-wraps and remove the CT-PET Positions cable from the table.
2.) Refer to
. Follow the cables back to the ETC Board I/F J8 connection.
3.) Disconnect the 15 pin D-Type Connector from J8 of the ETC I/F board.
Figure 6-19:
ETC Board Locations
4.) Cut the existing cable from the J8 connector, and pull out the CT-PET positions cable.
5.) Fasten a piece of tape over the remaining 15 pin D-Type connector.
J13
J10
J4
J24
J7
J8
ETC I/F Board (Piggyback)
Содержание Discovery LS
Страница 1: ...GE Healthcare OPERATING DOCUMENTATION 2307224 100 Rev 6 Discovery LS System Service Manual ...
Страница 2: ...GE HEALTHCARE DIRECTION 2307224 100 REVISION 6 DISCOVERY LS SYSTEM SERVICE MANUAL Page 2 ...
Страница 24: ...GE HEALTHCARE DIRECTION 2307224 100 REVISION 6 DISCOVERY LS SYSTEM SERVICE MANUAL Page 24 Table of Contents ...
Страница 32: ...GE HEALTHCARE DIRECTION 2307224 100 REVISION 6 DISCOVERY LS SYSTEM SERVICE MANUAL Page 32 List of Figures ...
Страница 110: ...GE HEALTHCARE DIRECTION 2307224 100 REVISION 6 DISCOVERY LS SYSTEM SERVICE MANUAL Page 110 Chapter 5 Console ...
Страница 222: ...GE HEALTHCARE DIRECTION 2307224 100 REVISION 6 DISCOVERY LS SYSTEM SERVICE MANUAL Page 222 Chapter 6 Table ...
Страница 242: ...GE HEALTHCARE DIRECTION 2307224 100 REVISION 6 DISCOVERY LS SYSTEM SERVICE MANUAL Page 242 Chapter 7 Gantry ...
Страница 357: ......