70 /
GE Title or job number /
8/2/2011
Factory Test Mode
Initiates automatically upon installation of a new main control.
1)
All LED’s lit - 10 seconds
2) Close door
3) Vent opens/ fan activated 5 seconds /vent close
– 15 seconds
4) Detergent module/Water valve energized - 45-65 seconds
depending on model
5) Main pump energized - 55 seconds
6) Turbidity sensor calibrated and other checks - 90 seconds
7) Drain pump energized
– 75 seconds
8) When 2
nd
fill starts, exit test mode by pressing “Start/Reset”.
(In some cases it may be necessary to unplug unit to exit test mode)
Appx.
5 min
NOTE: If left in factory test mode dishwasher could run for up to 75 minutes before exiting
Содержание Cafe CDWT280V
Страница 2: ...2 Presenter and Event 8 2 2011 ...
Страница 3: ...3 Presenter and Event 8 2 2011 ...
Страница 6: ...6 Presenter and Event 8 2 2011 Monogram Cafe Profile GE ...
Страница 15: ...15 GE Title or job number 8 2 2011 Lower rack roller Roller locks onto rack Spread roller tabs outward ...
Страница 32: ...32 GE Title or job number 8 2 2011 Drain Pump Check valve removed by simply pulling forward Outlet check valve ...
Страница 34: ...34 GE Title or job number 8 2 2011 10પF Start capacitor Mounted with 1 screw Motor Assembly ...
Страница 35: ...35 GE Title or job number 8 2 2011 Heater Heating Element connections in rear of machine 16 Ω resistance value ...
Страница 37: ...37 GE Title or job number 8 2 2011 Door ...
Страница 40: ...40 GE Title or job number 8 2 2011 New Look Inner Door Panel ...
Страница 44: ...44 GE Title or job number 8 2 2011 Remove 2 Phillips head screws for HMI control H M I Control ...
Страница 47: ...47 GE Title or job number 8 2 2011 Outer Door Panel Handle Removal Full length view ...
Страница 50: ...50 GE Title or job number 8 2 2011 Door Switch Door switch is held in place with 3 Phillips head screws L1 N ...
Страница 72: ...72 GE Title or job number 8 2 2011 ...