Chapter 8 - Power Requirements
Page 127
8–
Power
Req’s
Chapter 8
Power Requirements
Section 1.0
Introduction
The power distribution unit (PDU) supplied with the system transforms and distributes power to all
system components. The PDU is the only power entry point required to operate system.
To minimize voltage regulation effects, power wiring between the facility main distribution panel and
the PDU should be kept as short as possible.
When routing the power wiring all three phase wires and ground must be run in the same conduit
or raceway duct. Power wires should be routed separately from system control and signal cables,
using a separate conduit or trough in raceway duct.
Metallic conduit, floor duct or surface raceway may be used for running cables, depending upon
local codes and practices. However, cable passageways should be large enough to install any cable
with all other cables already installed. Use of non-metallic conduit is not recommended.