Installing the SVI FF for Double- Acting Operation
This section explains how to mount the SVI FF for the 84/85/86 kit for double-acting valve
positioner configurations.
To mount the kit:
1. Set valve to the closed position.
2. Install the mounting assembly to the yoke (Figure 27) using helical spring washer 5/16, flat
washer 5/16 and hex screw 5/16-18x44.5 [1.75] LG.
Figure 27 85/86 Valve
3. Set rod-ends and brackets to stroke and size of actuator. The default setting is a 4.00”
stroke. Other stroke settings are as in Figure 28.
Figure 28 Stroke Settings
Mount all components snug enough to stay in place but loose
enough to tap with rubber hammer into final position.
Lever
Rod-end
Kit Mount
Bracket
NOTE
Hole A: .50" to .80"
Hole B: 1.00" to 1.50"
Hole C: 2.00" to 2.50"
Hole D: 3.00" to 4.50"
Hole E: 5.00" to 6.00"
Содержание Baker Hughes Masoneilan SVI FF
Страница 12: ...This page intentionally left blank ...
Страница 72: ...This page intentionally left blank ...
Страница 82: ...This page intentionally left blank ...
Страница 94: ...This page intentionally left blank ...
Страница 108: ...This page intentionally left blank ...
Страница 198: ...This page intentionally left blank ...
Страница 206: ...This page intentionally left blank ...
Страница 224: ...This page intentionally left blank ...
Страница 228: ...This page intentionally left blank ...
Страница 230: ...This page intentionally left blank ...
Страница 250: ...This page intentionally left blank ...
Страница 262: ...This page intentionally left blank ...
Страница 263: ......