Masoneilan SVi1000 Positioner Quick Start Guide
=
|
19
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
Introduction
This section describes how to mount and wire the SVi1000, which includes:
“Step 1: Mounting the SVi1000” on page
“Mounting the SVi1000 on Rotary Valves” on page
“Mounting the SVi1000 on Reciprocating Valves” on page
“Step 2: Connecting the Tubing and Air Supply” on page
“Step 3: Wiring the SVi1000” on page
Failure to adhere to the requirements listed in this
manual may cause loss of life and property.
Before installing or using this instrument,
READ
THE INSTRUCTIONS CAREFULLY
. Refer to
“Hazardous Location Installation and Declaration
of Conformity” on page
72 for detailed instructions.
Do not connect a non-intrinsically safe approved
PC or
HART
®
modem to an intrinsically safe circuit
except on the safe area side of the barrier. Do not
operate a PC in a hazardous area without
compliance to local and plant
regulations.“Hazardous Location Installation and
Declaration of Conformity” on page
For units with optional switches refer to “Optional
Switch Load Limits” on page
WARNING
WARNING
CAUTION
3. Mounting and Wiring
Содержание BAKER HUGHES Masoneilan SVi 1000
Страница 1: ...Masoneilan SVi 1000 Positioner Quick Start Guide Rev L BHGE Data Classification Public...
Страница 8: ...This page intentionally left blank...
Страница 18: ...This page intentionally left blank...
Страница 38: ...This page intentionally left blank...
Страница 56: ...This page intentionally left blank...
Страница 86: ...This page intentionally left blank...
Страница 87: ......