Programming Site Data
2-1
September 2004
Introduction
The Model AT868 flow transmitter has a user program that provides
access to the various programmable features of the unit. To program
the AT868 you can use the internal keypad or
Panaview
™, a PC-
based, non-resident software program that communicates with the
AT868 through its serial port.
Note:
If you are using
Panaview
™, the AT868 is configured with the
Meter Address as 1 and the baud rate as 9600.
This section describes step-by-step programming instructions using
the internal keypad. For more information on programming using
PanaView
™, refer to Appendix F,
PanaView™PanaView™
.
Refer to the appropriate section for a discussion of the following
PROG
features:
•
CHx-ACTIV
- activate one or both channels/paths.
Note:
The AT868 uses two channels or paths to make more accurate
flow measurement by averaging, substracting or adding the
channels/paths together.
•
CHx-SYSTM
- select volumetric, totalizer and mass flow units and
other parameters.
•
CHx-PIPE
- enter the pipe geometry and other parameters.
•
CHx-I/O
- set up the analog and totalizer/frequency outputs.
•
CHx-SETUP
- set the signal limits, response times and activating
mass flow.
•
GLOBL-SYSTM
- select system units (English and metrics).
•
GLOBL-I/O
- set up error handling, outputs and display.
•
GLOBL-COMM
- set the serial port parameters.
Note:
The “x” in
CHx
represents the channel/path number. If you are
using a single channel meter, only Channel 1 will appear.
To get the AT868 up and running as quickly as possible, you must (as
a minimum) activate the channel/path(s) and enter channel/path data,
global system data, and pipe parameters. At the end of each section
are directions that will help you in programming required (quick
startup) and optional data.
Also, as a programming aid, a complete set of menu maps for
PROG
are included in Appendix A,
Menu Maps
. The specific figure
numbers will be referenced throughout this chapter.
Note:
In this manual, only the programming of Channel 1 will be
described. To program Channel 2 of a 2-channel/path meter,
simply repeat the same procedures presented for Channel 1.
Содержание AquaTrans AT868
Страница 8: ...Chapter 1 ...
Страница 24: ...Chapter 2 ...
Страница 60: ...Chapter 3 ...
Страница 66: ...Chapter 4 ...
Страница 72: ...Chapter 5 ...
Страница 77: ...Chapter 6 ...
Страница 88: ...Chapter 7 ...
Страница 98: ...Chapter 8 ...
Страница 106: ...Appendix A ...
Страница 112: ...Appendix B ...
Страница 113: ...CE Mark Compliance Introduction B 1 EMC Compliance B 1 LVD Compliance B 2 ...
Страница 116: ...Appendix C ...
Страница 117: ...Data Records Site Data C 1 ...
Страница 122: ...Appendix D ...
Страница 123: ...Measuring P and L Dimensions Measuring P and L D 1 ...
Страница 126: ...Appendix E ...
Страница 127: ...Service Record Introduction E 1 Data Entry E 1 Diagnostic Parameters E 3 ...
Страница 129: ...September 2004 E 2 Service Record Table E 1 Service Record cont Date Description of Service Performed By ...
Страница 131: ...Appendix F ...