12
49-80520-8
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Additional Materials:
• 120V 60Hz, 15 or 20 Amp, 2 wire with ground.
Properly grounded branch circuit.
• Strain relief for junction box.
• 7” round metal duct or 3-1/4” x 12” rectangular
duct length to suit installation.
REMOVE THE PACKAGING
• Remove the small box housing the motor.
• Lift the hood out of the box.
• Remove shipping screws holding the wood
mounting piece to the back side of the hood. Set
aside wood mounting piece and screws for later
installation. Do not discard.
• Remove the “V” shaped carton insert.
• Remove parts package from the “V” shaped
cardboard insert.
• Remove junction box cover and knockout.
• Install strain relief onto back or top of hood.
• Remove all tape and packing material from the
hood, duct transition and motor.
INSTALLATION PREPARATION
Pliers
Wire Cutter/Stripper
Tin Snips
Allen Wrench
Spirit level
Duct tape
Safety glasses
Ladder
Saber saw or Key Hole Saw
Phillips and Flat blade
screwdrivers
1/4” pivoting hex socket
Hammer
Electric drill with 1/8” and 3/8” bits
Flashlight
UL Listed Wire nuts
Pencil and tape
measure
Wood
Mounting
Support
Hood
Parts
Package
Shipping Carton
Motor
Содержание Appliances CV966
Страница 23: ...49 80520 8 23 Notes...
Страница 47: ...49 80520 8 23 Notas...