Total volume and shelf
area are calculated by
the Association of Home
Appliance Manufacturers’
standards.
AJEQ06LCD
GE
®
115 Volt Window/Wall Mount Heat and Cool Unit
Wall Case Dimensions and Installation Information (in inches)
Listed by
Underwriters
Laboratories
For answers to your Monogram,
®
GE Profile
™
or
GE
®
appliance questions, visit our website at
ge.com or call GE Answer Center
®
service,
800.626.2000.
Specification Created 9/09
390362
I
nstallation Information:
A finished opening of 26-1/8" x 15-3/4"
clear of intrusions is required. Keep clearance of 4" from side
walls. Brick veneer or frame walls should have wood studding
surrounding case to provide firm anchoring with screws. Case
can be fastened directly to brick or block walls with screws sunk
in lead expansion shields.
Note:
Units should be caulked on all four sides of case to the
building exterior to assure building integrity.
Two Wall Cases for Tenant Option Installation
When the air conditioner is offered as a tenant option, these
wall cases provide protection against outside elements.
RAB47
– includes wall case, exterior grille and steel
closure panels.
RAB48
– includes wall case, exterior grille, steel closure panel
and two layers of insulation.
Standard Wall Case RAB46
Solid-sided wall case fabricated of galvanized steel with
baked enamel finish. Welded areas are coated with a sealing
compound to help resist rust and corrosion. Polymer gasket
surrounds opening to assure tight weather seal. Aluminum grille
(RAG13) is included. Panels on interior and between case and
grille provide weather protection prior to installation of chassis.
Provide firm anchoring with screws. Case can be fastened
directly to brick or block walls with screws sunk in lead
expansion shields.
Built-in RAC Installation
(Pub. 1-G003 pg. 138) April 30.1993
Make frame if desired or caulk
between case and siding
15-3/4
26-1/8
Frame Construction
Brick Block and Brick
Frame Construction
Fill open cells
with mortar
or insulation
15-3/4
26-1/8
Lintel
Lintel
OUTSIDE
INSIDE
16-7/8
Caulking
Drip Rail
Trim Molding
(if desired)
Plaster Line
Built-In Room Air Conditioners
Wall Opening for RAB36/37/38 Case
A finished opening of 26-1/8" x 15-3/4", clear of
intrusions, is required. Keep clearance of 4" from
side walls. Brick veneer or frame walls should have
wood studding surrounding case to provide firm
anchoring with screws. Case can be fastened directly
to brick or block walls with screws sunk in lead
expansion shields.
Flexible Mounting Position
Built-in RAC Installation
(Pub. 1-G003 pg. 138) April 30.1993
Make frame if desired or caulk
between case and siding
15-3/4
26-1/8
Frame Construction
Brick Block and Brick
Frame Construction
Fill open cells
with mortar
or insulation
15-3/4
26-1/8
Lintel
Lintel
OUTSIDE
INSIDE
16-7/8
Caulking
Drip Rail
Trim Molding
(if desired)
Plaster Line
Built-In Room Air Conditioners
Wall Opening for RAB36/37/38 Case
A finished opening of 26-1/8" x 15-3/4", clear of
intrusions, is required. Keep clearance of 4" from
side walls. Brick veneer or frame walls should have
wood studding surrounding case to provide firm
anchoring with screws. Case can be fastened directly
to brick or block walls with screws sunk in lead
expansion shields.
Flexible Mounting Position
Built-in RAC Installation
(Pub. 1-G003 pg. 138) April 30.1993
Make frame if desired or caulk
between case and siding
15-3/4
26-1/8
Frame Construction
Brick Block and Brick
Frame Construction
Fill open cells
with mortar
or insulation
15-3/4
26-1/8
Lintel
Lintel
OUTSIDE
INSIDE
16-7/8
Caulking
Drip Rail
Trim Molding
(if desired)
Plaster Line
Built-In Room Air Conditioners
Wall Opening for RAB36/37/38 Case
A finished opening of 26-1/8" x 15-3/4", clear of
intrusions, is required. Keep clearance of 4" from
side walls. Brick veneer or frame walls should have
wood studding surrounding case to provide firm
anchoring with screws. Case can be fastened directly
to brick or block walls with screws sunk in lead
expansion shields.
Flexible Mounting Position