NOTE:
The thread on the test port, and the lower part of the gauge adapters is LEFT-
HANDED. The following procedure details the correct method for mounting devices
using these adapters: -
1. Screw the appropriate gauge adapter
fully on to the instrument to be tested.
2. Screw assembly down COUNTER-CLOCKWISE
on to test port.
Note:
Hand-tight is sufficient; ensure that the bottom
face contacts the O-ring on the test port.
FIGURE 2-2A
MAKING PRESSURE CONNECTIONS
2-2
CONNECTIONS
Содержание 5514
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK 1 2 PREPARATION ...
Страница 12: ......
Страница 14: ...THIS PAGE INTENTIONALLY LEFT BLANK 3 2 PRIMING ...
Страница 17: ......
Страница 18: ......
Страница 20: ...THIS PAGE INTENTIONALLY LEFT BLANK 4 6 MAINTENANCE SERVICING ...
Страница 22: ...THIS PAGE INTENTIONALLY LEFT BLANK 5 2 ANCILLARY EQUIPMENT ...