
Chapter 2: Installation
l
a
u
n
a
M
r
e
s
U
h
c
ti
w
S
d
e
g
a
n
a
M
t
e
n
r
e
h
t
E
E
o
P
-
2
8
d
n
a
2
8
-
S
D
-
E
G
8
1
Step 4:
Repeat these steps to attach the second bracket to the opposite side.
Step 5:
After the brackets are attached to the Managed Switch, use suitable screws to
securely attach the brackets to the rack, as shown in Figure 7.
Figure 7: Mounting the GE-DS-82 in a rack
Step 6:
Follow steps 4 and 5 of the Desktop Installation section to connect the
network cabling and supply power to the Managed Switch.
SFP Transceiver Installation
This section describes how to insert an SFP transceiver into an SFP slot.
SFP transceivers are hot pluggable and hot swappable. You can insert and remove a
transceiver from any SFP port without powering down the Managed Switch, as
shown in Figure 8.
GE-DS-82
1
3
5
7
2
4
6
8
PWR
Gigabit
8-Port 10/1 2 Gigabit
Managed Swit
ch
ACT
LNK
1000
10/100
ACT
LNK
ACT
LNK
100
4
6
8
2
1
3
5
7
10
9
9
10
Mini-GBIC
RESET
10
9
Содержание GE-DS-82
Страница 26: ...Chapter 2 Installation 22 GE DS 82 and 82 PoE Ethernet Managed Switch User Manual ...
Страница 149: ...Chapter 5 Console Management 146 GE DS 82 and 82 PoE Ethernet Managed Switch User Manual ...
Страница 213: ...Chapter 6 Command Line Interface 210 GE DS 82 and 82 PoE Ethernet Managed Switch User Manual ...
Страница 216: ...Chapter 7 Command Line Interface GE DS 82 and 82 PoE Ethernet Managed Switch User Manual 213 ...