AquaBead/AlphaONE PLUS
System
Assembly
Step 3: Set your Zapp
Pure UV to the back
right of the pad.
(Zapp Pure UV not
shown in Picture)
Step 4: Set water pump
to the front right side of
the pad.
AquaBead/AlphaONE PLUS
System
Assembly
Step 5: Attach Multiport
valve to front of filter.
(See Filter manual for
more details)
It is now time to start
assembling the
plumbing. Connect
“like number to like
number” as shown in
the picture.
Hand
tighten unions until
snug.
AquaBead/AlphaONE PLUS
System
Assembly
Step 6:
Attach pipe from
pump to top opening
of Multiport valve.
Step 7: Connect pipe
from the lower Multiport
opening to the lower UV
opening.
(If your system is
equipped with an Aqua-
Sieve connect lower
AquaSieve fitting to front connection of pump.)
Step 8: Place beads into
filter. (See AquaBead
manual)
Tighten top onto filter
using special wrench
(included).
Note: Make sure no
beads are on or in the threads before installing
and tightening.
AquaBead/AlphaONE PLUS
System
Assembly
Step 9:Place Bead Agita-
tor onto AquaBead filter.
Note: Do Not Glue. Nor-
mally pressure fitting
into place is sufficient. If
it isn’t, secure with a set
screw through Agitator
into pipe.
Step 10: Install “ALISS”
valve so that barb fit-
ting is pointing down.
Screw gauge onto Mul-
tiport valve.
After double checking all connections to make
sure they are tight you are ready to prime and
start the system. We recommend that a
“SWING” check valve be installed below surface
grade of pond on intake into the system. This
will make the priming of the system a snap.
To Prime system, fill AquaSieve (if so equipped)
with water and pump with water. Close the units
and start pump.
If you should require help with your system. Call
your dealer for assistance. If you need further help
you can reach us toll free at 866-712-7007.
We want to Help!