Installation
F-60 Operation and Maintenance Manual
2-6
© GBC Pro-Tech 1998 July
6WDUWXS
The first time the laminator is started and every time it
is serviced you should use the following checklist to
confirm that the unit is operating properly and that all
safety mechanisms are functioning.
Startup Checklist
Start the laminator and go through the following check-
list.
❏
Are the emergency stop buttons working?
Push down on one of the emergency stop buttons.
The laminator should stop. Pull up on the button
and push the reset button on the lower back of the
laminator. The laminator should resume operation.
Always check all buttons.
WARNING
❏
Is the mechanical guard system working?
With the laminator running, remove the mechani-
cal guard from the infeed side of the machine. The
roll
s should stop. Replace the guard. The laminator
should resume operation.
WARNING
❏
Is the footswitch working?
With the laminator running, remove the mechani-
cal guard from the infeed side of the machine. The
roll
s should stop. Press the footswitch. The lamina-
tor should resume operation. Vary the speed using
the footswitch (like an automobile accelerator) to
ensure that the footswitch is operating properly at
various speeds.
WARNING
❏
Is the motor functioning?
Test the motor at various speeds ranging from
0-15. At 0 the
roll
s should stop turning.
Run the motor in both forward and reverse.
❏
Are the heaters working?
Verify that the heater controller heats the top roll.
Once you have completed the startup checklist you can
safely run a test sample.
Never operate the laminator unless all of the
emergency stop buttons are functioning properly.
You can be crushed or burned.
Never operate the laminator unless the
mechanical guard system is operating properly.
You can be crushed or burned.
Use extreme caution when operating the machine
with the guard off. You can be crushed or
burned.
Содержание F-
Страница 1: ......
Страница 2: ......
Страница 12: ...Safety F 60 Operation and Maintenance Manual 1 6 GBC Pro Tech 1998 July Blank page...
Страница 42: ...Warranty F 60 Operation and Maintenance Manual 5 2 GBC Pro Tech 1998 July Blank page...
Страница 44: ...Specifications F 60 Operation and Maintenance Manual 6 2 GBC Pro Tech 1998 July Blank page...