![GBC 930-400 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/gbc/930-400/930-400_operation-manual_3943219033.webp)
Falcon 36 Operation Manual
Operation
GBC Pro-Tech 1997 October
3-15
352&(66&21752/&+$57E
Two Pass Mount and Hot Overlaminate, Second Pass
MATERIALS
Upper Media
N/A
Image Media
N/A
Lower Media
N/A
Mounting Substrate
Foam Core
LAMINATOR SETTINGS
Top Heater Status
OFF
Drive Mode
Manual (Footswitch)
Bottom Heater Status
OFF
Pull Roll Position
DOWN
Speed
2-3 ft/min
Output Cooling
OFF
Drive Direction
REV
Main Roll Setting
UP
352&(66&21752/',$*5$0E
Encapsulated Image
Release Liner
CAUTION: Do not
allow foam board to
drop below Fan
Bridge Lip
Foam Core
Notes
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Содержание 930-400
Страница 10: ...Safety Falcon 36 Operation Manual GBC Pro Tech 1997 October 1 6 Blank page...
Страница 42: ...Maintenance and Troubleshooting Falcon 36 Operation Manual 4 8 GBC Pro Tech 1997 October...
Страница 44: ...Maintenance and Troubleshooting Falcon 36 Operation Manual 4 10 GBC Pro Tech 1997 October Blank page...
Страница 46: ...Warranty Falcon 36 Operation Manual 5 2 GBC Pro Tech 1997 October Blank page...
Страница 48: ...Technical Information Falcon 36 Operation Manual 6 2 GBC Pro Tech 1997 October Blank page...