GBA GV1 Скачать руководство пользователя страница 30

G

B

A

 G

lo

b

a

l B

ill

 A

c

c

e

p

to

rs

   

 

G

B

A

 G

V

1

 O

p

e

ra

tio

n

 M

a

n

u

a

l

 

 

A

s

tr

o

s

y

s

 In

te

rn

a

tio

n

a

l L

td

 

O

c

to

b

e

r 2

0

1

8

 

G

B

A

 G

V

1

 O

p

e

ra

tio

n

 M

a

n

u

a

l v

2

.0

0

   

   

   

   

   

   

   

   

   

   

   

   

   

   

  P

a

g

e

 3

0

 o

f 3

3

 

1

0

.2

 T

ro

u

b

le

s

h

o

o

tin

g

 

T

h

e

 f

o

llo

w

in

g

 in

fo

rm

a

tio

n

 is

 p

re

s

e

n

te

d

 a

s

 g

u

id

a

n

c

e

 t

o

 c

u

s

to

m

e

rs

 in

 id

e

n

tif

y

in

g

 s

e

rv

ic

e

 p

ro

b

le

m

s

 

w

ith

 

th

e

 

G

V

1

 

u

n

it.

 

 

It 

d

o

e

s

 

n

o

n

e

c

e

s

s

a

ril

y

 

c

o

v

e

e

v

e

ry

 

p

o

s

s

ib

le

 

s

itu

a

tio

n

 

R

e

fe

re

n

c

e

 

to

 

th

e

 

D

ia

g

n

o

s

tic

 L

E

D

 fa

u

lt 

ta

b

le

s

 (

s

e

e

 1

0

.1

.2

 &

 1

0

.1

.3

) w

ill 

h

e

lp

 id

e

n

tif

y

 m

a

n

y

 p

ro

b

le

m

 c

o

n

d

iti

o

n

s

Possible Solution

 

1.  Ensure power to validator is 

connected and turned-on 

2.  Ensure Interface cable(s) are 

connected firmly & correctly 

1.  Use on-board button or GV Talk to 

enable required note  

(On-board 

button applicable to Pulse & Parallel 
modes only)

 

1.  Use on-board button or GV Talk to 

enable required notes 

2.  Use GV Talk to check sensor levels 

and recalibrate if necessary 

3.  Clean validator note path 

1.  Ensure all cables are connected 

properly 

2.  Enusre cashbox is correctly located 

and free from damage 

1.  Use on-board button or GV Talk to 

select required interface 

2.  Ensure Interface cable(s) are 

connected firmly & correctly 

1.  Use on-board button or GV Talk to 

select required interface 

2.  Ensure Interface cable(s) are 

connected firmly & correctly 

MAKE REFERENCE TO 'GV1' & 'VAL' DIAGNOSTIC LED TABLES (10.1.2 & 10.1.3) 

Investigate

 

1.  Power supply and power cable 

2.  Diagnostics indicator ('GV1' 

LED) 

3.  Interface Cable assembly(s) 

1.  Software configuration 

1.  Note Inhibit settings 

2.  Note path cleanliness 

1.  Stacker motor cable 

connections 

2.  Stacker jams 

3.  Damaged/distorted note in 

Cashbox 

1.  Configuration of validator 

2.  Interface cable assembly(s) 

1.  Configuration of validator 

2.  Interface cable assembly(s) 

Possible Cause

 

1.  Power supply not switched on 

2.  Power supply not connected 

3.  Poor electrical connections 

4.  Unit carrying out self-test 

5.  PSU failure 

1.  Acceptance inhibited for all 

notes 

2.  ST2 module mechanical gate 

(MASG) not working 

3.  Escrow sensor not working 

1.  Note acceptance inhibited 

2.  Poor sensor readings 

3.  Insufficient power supply 

capacity 

1.  Ready-to-Punch sensor not 

working 

2.  Stacker motor not working 

3.  Stacker mechanism damaged 

1.  Incorrect interface selected 

2.  Poor electrical connections 

1.  Incorrect Interface selected 

2.  Poor electrical connections 

 

Problem Symptoms

 

Unit does not work - belt 
motor does not run, no 
LED illumination 

All programmed notes are 
rejected 

Poor or no acceptance of 
one or more programmed 
notes 

Notes fail to stack correctly 

Unit does not 
communicate with host 
machine 

Unit does not provide 
credit for accepted note 

 

Содержание GV1

Страница 1: ...ber 2018 GBA GV1 Operation Manual v2 00 Page 1 of 33 GVI Operation Manual This document is the copyright of Astrosys International Ltd and may not be reproduced in total or in part by any means electr...

Страница 2: ...6 6 0 PROGRAMMING GV1 17 6 1 Programming 17 6 2 Programming Ports Switches 18 6 3 On board Controls 19 6 3 1 GV1 DIP switches 19 7 0 ELECTRICAL INTERFACE SPECIFICATION 20 7 1 Power 20 7 1 1 Power Supp...

Страница 3: ...of the extensive GV1 features A wide range of interfaces including Parallel Pulse Serial MDB ccTalk SSP SGI etc Accepts up to 32 notes per configuration in 4 directions max note width 85mm Accepts no...

Страница 4: ...A Power Consumption Idle Standby 450mA 12V typical Validating 1 5A 12V typical Stacking 1 5A 12V typical Peak Inrush Stalled 3 5A 12V Environmental Range Operating Temp 0 to 55 C Operating Hum Up to 9...

Страница 5: ...dule can be rotated or removed altogether for rapid access to the notepath surface in conjunction with the hinged Roller Housing assembly of the GV1 The entire ST2 module can be quickly removed from t...

Страница 6: ...al Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 6 of 33 The above sequence can also be performed with the ST2 module in place in the GV1 unit Depress Side Latches to release ST2 module lift ou...

Страница 7: ...lobal Bill Acceptors GBA GV1 Operation Manual Astrosys International Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 7 of 33 2 2 3 Removing the Cashbox 2 Press Cashbox Release Button 1 Unlock Cas...

Страница 8: ...GBA Global Bill Acceptors GBA GV1 Operation Manual Astrosys International Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 8 of 33 3 Remove Cashbox...

Страница 9: ...l 2 Runway Gaming 3 Bezel Concealed Metal 4 Bezel Universal 5 Note Entry Adaptor 9 Note Guide 0 None 1 US up to 66mm 3 EU stepped up to 82mm 5 Canada up to 72mm 6 GB stepped up to 85mm 7 India up to 7...

Страница 10: ...v2 00 Page 10 of 33 3 0 NOTE ENTRY OPTIONS 3 1 Note Entries GV1 can be fitted with two key styles of Noteguide Entry Universal Note Guide typically for gaming applications Elite Gaming Bezel Entry spe...

Страница 11: ...module Outer Inner Noteguide Inserts must be of the same currency type to avoid note handling issues Outer Noteguide Inserts differ between Runway Bezel types and are not interchangeable between the...

Страница 12: ...ce looks at taking a GV1 unit and disassembling the Note Entry area for example if the area needed to be reconfigured Reassembly is essentially the reverse process substituting different parts as requ...

Страница 13: ...l Bill Acceptors GBA GV1 Operation Manual Astrosys International Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 13 of 33 Slide Clamp moulding 2 back out Unplug PCB loom 3 lift Noteguide Base 4 o...

Страница 14: ...cility if specified an Audit PCB is installed inside the Cashbox cap Security Lock for locking the Cashbox to the GV1 unit 12mm Lock fitted as default or Cashbox configured to accept customer supplied...

Страница 15: ...ill Acceptors GBA GV1 Operation Manual Astrosys International Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 15 of 33 The following illustration shows the Cashbox Lock options GV1 Locking Plate...

Страница 16: ...ovided on the steel sideplates for mounting into cages framework Care should be taken that the screw length used is appropriate screws that are excessively long may interfere with functionality such a...

Страница 17: ...ce It is worthwhile to understand that the overall functionality of GV1 is split between the ST2 validation module and the GV1 unit itself The ST2 validation module is primarily concerned with the cur...

Страница 18: ...s explained in the comprehensive GV1 Reference Manual 6 2 1 Image illustrating Indicator LEDs and programming features 6 2 2 Image illustrating Front Door control area ST2 PUSHBUTTON ST2 DIAGNOSTIC LE...

Страница 19: ...with the switch actuator Down flat when viewing the PCB from the front of the GV1 To disable a note locate the appropriate DIP switch and flick to the Up angled position with the GV1 in normal operati...

Страница 20: ...ace 7 2 1 General Purpose Open Collector outputs Maximum Open Voltage 40V Maximum Sink Current 50mA Maximum Output Low Voltage 0 4VDC Input low level voltage 0 1V Input high level voltage 3 12V typica...

Страница 21: ...on Manual Astrosys International Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 21 of 33 8 0 CONNECTION OPTIONS GBA 20 pin Gaming 20 pin MDB USB Illustration showing the Interface Connector opti...

Страница 22: ...dering requirement The listing has the following format Connection Option o Interface GBA 20 pin o Pulse o Parallel o ccTalk o GBA BSCP o Mars Serial A o SSP Gaming 20 pin o Serial Gaming Interface Lo...

Страница 23: ...ee pics 1 2 5 The ST2 top half and Rear Housing can both be fully removed if desired see pic 3 6 Pick off and discard any large items of debris from the note path top bottom 7 Using the cotton swab or...

Страница 24: ...ead Unit assembly from the GV1 unit if the host enclosure does not allow access to the ST2 validation module and opening Rear Housing 3 Squeeze the release levers for the top half of the ST2 validatio...

Страница 25: ...GBA Global Bill Acceptors GBA GV1 Operation Manual Astrosys International Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 25 of 33 3 4...

Страница 26: ...GBA Global Bill Acceptors GBA GV1 Operation Manual Astrosys International Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 26 of 33 5...

Страница 27: ...e indicators are tri colour capable of glowing Red Green or Orange The indicators enable enhanced diagnostics for the user and for Astrosys personnel when assisting customers from a remote location Th...

Страница 28: ...eject Codes Unrecognised Note Red x 1 OASG Reject Red x 2 MASG Reject Orange x 2 Returned note inhibited in config settings Red x 3 Returned note inhibited by host Orange x 3 Transport during note sca...

Страница 29: ...sette Green Orange Green Orange OASG Optical Anti Stringing Gate MASG Mechanical Anti Stringing Gate This condition only occurs in serial interfaces e g GBA RS 232 MDB ccTalk Note The GV1 LED Indicato...

Страница 30: ...cable s are connected firmly correctly MAKE REFERENCE TO GV1 VAL DIAGNOSTIC LED TABLES 10 1 2 10 1 3 Investigate 1 Power supply and power cable 2 Diagnostics indicator GV1 LED 3 Interface Cable assem...

Страница 31: ...GBA Global Bill Acceptors GBA GV1 Operation Manual Astrosys International Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 31 of 33 11 0 DIMENSIONAL DRAWINGS 11 1 Unit without Noteguide...

Страница 32: ...GBA Global Bill Acceptors GBA GV1 Operation Manual Astrosys International Ltd October 2018 GBA GV1 Operation Manual v2 00 Page 32 of 33 11 2 Cashbox...

Страница 33: ...nalties arising from the adherence to reliance on or interpretation of this document REGIONAL OFFICES AstroSystems Ltd Microsystem Controls Pty Ltd 1 The Quadrangle Unit D2 0 63 85 Turner Street Grove...

Отзывы: