STEP 6
STEP 7
STEP 8
STEP 8
6. COVER INSTALLATION
a) Take the roof and place it over the structure, staps inside. Make sure that the windows are on the two sides
at the front of the shelter.
b) Tie all the ties around the pipes. Take the straps and pass them underneath the pipes, pull up and tighten
through metal buckle.
7. DOOR ASSEMBLY
a) Install doors at each end. Use elastics (L) to attach the door to the roof with hooks (N).
b) Take an elastic, put through one of the grommet holes on the door from the inside out. Take S hook, place it
on the elastic and squeeze one end with a pair of pliers so it locks on the elastic. Repeat until all the elastics
are done, and then use the open end to hook onto the grommet band on the side of the roof.
c) Use the rail hooks (01-357) to attach door the door rails. When closing at the front, make sure all elastics
are attached on the inside and outside of the shelters.
8. SHELTER REINFORCEMENT
a) Before you install the floor brackets, make sure the distance between the legs is 18 feet wide.
b) Place the floor brackets (K) at each end of the shelter. Then drive in nails (J) into ground. The structure has
to be anchored on a flat leveled surface as asphalt, concrete, etc. Additionnal anchors are not included.
STEPS
Содержание 7171001
Страница 4: ...SCH MA SCHEMA...