ZZZ-183.41215-32.1127-15.GP.EN.HER.doc
HER-HP 8
Step 10:
Once the PC roof is complete, use aluminum edging ( S, U, W, Ss) to surround the edges of PC roof,
and using bolt (Bb) and roof joint (R), tighten securely.
Step 11:
Once the installation of the edging complete, start affixing the roof cross bars (T, V, X, Tt) using bolt (Ff).
Affix the top cross bars (Uu) onto the roof rafter (L) using bolt (Ff).