background image

Visit us at 

www.enersys.com

Battery Installation, 

Operation and 

Maintenance Instructions 

NEXT GENERATION 

OF BATTERIES

KGM...P 

KGL...P 

Visit us at 

www.enersys.com

Содержание lomain KGL P Series

Страница 1: ...Visit us at www enersys com Battery Installation Operation and Maintenance Instructions NEXT GENERATION OF BATTERIES KGM P KGL P Visit us at www enersys com ...

Страница 2: ... battery do not place tools or items on top of the battery Handling DataSafe XE batteries are supplied in a charged condition and are capable of extremely high short circuit currents Take care to avoid short circuiting terminals of opposite polarity California Proposition 65 Warning Battery posts terminals and related accessories contain lead an cause cancer and reproductive harm Wash hands after ...

Страница 3: ...onstant current charging divide the battery into two parts and charge them individually cells stored up to 6 months A commissioning charge is normally not required and the cells are ready for service If full performance is necessary immediately a commissioning charge of 20 hours at 1 65 V cell with current limited to 0 1 It A is recommended This procedure is carried out without the red low pressur...

Страница 4: ...ions Only use distilled or deionized water to top up the cells in accordance with IEC 60993 1989 NOTE Once the battery has been filled with the correct electrolyte at the factory there is no need to regulary check the electrolyte density Interpretation of density measurements is difficult and could lead to misunderstandings Electrical parameters Check the float voltage measurements of every single...

Страница 5: ...n Plugs and Fitting of Vent Caps KGL 12 440 P KGM 11 400 P KGL 500 1570 P KGM 450 1560 P Step 1 before commissioning charge Step 1 before commissioning charge Step 2 after commissioning charge Step 2 Step 3 after commissioning charge ...

Страница 6: ...35 P KGM 11 30 P KGL 45 60 P KGM 40 55 P 1 2 3 4 5 Cell container Cell connector Spring washer Hexagonal screw Connector cover 1 2 3 4 5 Cell container Cell connector Spring washer Hexagonal screw Connector cover Note typical layout only Refer to section 9 for details KGL 12 35 P KGM 11 30 P 1 Cell 2 Cell connector 3 Spring washer 4 Nut 5 Connector cover 8 Layout details inter cell connection KGL ...

Страница 7: ...r 4 Spring washer 5 Screw 6 Connector cover 7 End terminal connector 8 Cover end terminal connector 7 Note typical layout only Refer to section 9 for details KGL 70 440 P KGM 65 400 P 1 Cell 2 Cell connector 3 Spring washer 4 Screw 5 Connector cover 1 5 4 3 2 1 5 4 3 2 6 7 8 ...

Страница 8: ... KGL 45 P KGL 60 P Male thread M10 KGL 665 P KGL 835 P Female thread M10 KGL 70 P KGL 275 P Female thread M8 KGL 890 P KGL 1110 P Female thread M10 KGL 300 P KGL 440 P Female thread M10 KGL 1260 P KGL 1570 P Female thread M10 Cells assembled in a 2 row configuration 9 Cell Layout ...

Страница 9: ... M10 KGM 65 P KGM 250 P Female thread M8 KGM 270 P KGM 400 P Female thread M10 KGM 450 P KGM 570 P Female thread M10 KGM 600 P KGM770 P Female thread M10 KGM 800 P KGM 1130 P Female thread M10 KGM 1250 P KGM 1350 P Female thread M10 Cells assembled in a 2 row configuration ...

Страница 10: ...ing 11 03 Singapore 189721 Tel 65 6508 1780 EnerSys World Headquarters 2366 Bernville Road Reading PA 19605 USA Tel 1 610 208 1991 1 800 538 3627 EnerSys EMEA EH Europe GmbH Baarerstrasse 18 6300 Zug Switzerland 2017 EnerSys All rights reserved Trademarks and logos are the property of EnerSys and its affiliates unless otherwise noted Contact ...

Отзывы: