10
The installation procedures are as follows:
1.
The limit default setting is for gate in close
position. Before installation, please make sure
gate is closed.
2.
Prepare one or more conduits for the electrical
cables. Cable conduits have to pass through the
hole in the base plate.
3.
Put the base plate to the ground. It's only
temporary installation. Further adjustment will be
required when installing the chain.
4.
Make the chain go through the chain box, Fix
the chain to the gate frame with the chain bolts.
(Bolts and brackets supplied in package.)
5.
Mount the chain box to the base plate by using
screws and washers, don’t make the four screws
too tight.
6.
Move the opener to the proper position, Fix
the opener to the ground with 4 expansion bolts
supplied in the package.
Manual Operation
The opener comes with an easy operating manual release. It brings the easiest manual release operation just
in case of any emergency.
Insert the manual release key supplied in package to release lock, then turning the key clockwise 90
degrees.
Pull out the release lock part to be more than 90 degrees, now the gear and shaft are disengaged.
Refer to the figures below
Содержание GA2000
Страница 20: ...20 Control Board Wiring Diagram...