Ground Drive - Calibration
Page
45
10/09
VARIATOR SETTING GUIDE
(INDICATIVE ONLY)
MATERIAL
UREA
MATERIAL BULK DENSITY
780
(kg/cubic metre)
SPROCKET RATIO
STANDARD
SR Meterbox / 3 Meterwheels fitted
160
7.1
9.5
------- ------- ------- ------- ------- ------- -------
120
5.3
7.1
8.9
------- ------- ------- ------- ------- -------
100
4.4
5.9
7.4
8.9
------- ------- ------- ------- -------
APPLICATION
80
3.6
4.7
5.9
7.1
8.3
9.5
------- ------- -------
RATE (kg/ha)
60
2.7
3.6
4.4
5.3
6.2
7.1
8.0
8.9
9.8
PER BIN
40
1.8
2.4
3.0
3.6
4.1
4.7
5.3
5.9
6.5
20
0.9
1.2
1.5
1.8
2.1
2.4
2.7
3.0
3.3
6
8
10
12
14
16
18
20
22
PLANTING WIDTH (metres)
SR Meterbox / 4 Meterwheels fitted
160
5.4
7.3
9.1
------- ------- ------- ------- ------- -------
120
4.1
5.4
6.8
8.2
9.5
------- ------- ------- -------
100
3.4
4.5
5.7
6.8
7.9
9.1
------- ------- -------
APPLICATION
80
2.7
3.6
4.5
5.4
6.4
7.3
8.2
9.1
-------
RATE (kg/ha)
60
2.0
2.7
3.4
4.1
4.8
5.4
6.1
6.8
7.5
PER BIN
40
1.4
1.8
2.3
2.7
3.2
3.6
4.1
4.5
5.0
20
-------
0.9
1.1
1.4
1.6
1.8
2.0
2.3
2.5
6
8
10
12
14
16
18
20
22
PLANTING WIDTH (metres)
SR Meterbox / 6 Meterwheels fitted
160
3.6
4.7
5.9
7.1
8.3
9.5
------- ------- -------
120
2.7
3.6
4.4
5.3
6.2
7.1
8.0
8.9
9.8
100
2.2
3.0
3.7
4.4
5.2
5.9
6.7
7.4
8.1
APPLICATION
80
1.8
2.4
3.0
3.6
4.1
4.7
5.3
5.9
6.5
RATE (kg/ha)
60
1.3
1.8
2.2
2.7
3.1
3.6
4.0
4.4
4.9
PER BIN
40
0.9
1.2
1.5
1.8
2.1
2.4
2.7
3.0
3.3
20
------- -------
0.7
0.9
1.0
1.2
1.3
1.5
1.6
6
8
10
12
14
16
18
20
22
VARSETT4SR
PLANTING WIDTH (metres)