![Gasmate QUASAR 4 Скачать руководство пользователя страница 9](http://html2.mh-extra.com/html/gasmate/quasar-4/quasar-4_manual_5065103009.webp)
9
8
ASSEMBLY INSTRUCTIONS
STEP 7
Attach the left side burner front panel to the side burner shelf with 2 x M6x12 bolts (A). Attach the side shelf front panel
to the side shelf with 2 x M6x12 bolts (A).
STEP 8
Fix 8 x M6x15 bolts (D) to the sides of the cabinet. Loosen the bolts, lower the side shelves over the bolts as shown
below and retighten the bolts. Use a M5x12 bolt (B) to affix the side front panels on each end.
STEP 9
Attach the side burner nozzle fixing bracket with 2 x M6x12 bolts (A). Insert the side burner nozzle into the fixing
bracket. Tighten nut to nozzle using a spanner.
D
B
D.
M6x15 (8x)
A.
M6x12 (4x)
A.
M6x12 (2x)
B.
M5x12 (2x)
Содержание QUASAR 4
Страница 5: ...5 EXPLODED DIAGRAM...
Страница 18: ...18 This page has been left intentionally blank...
Страница 19: ...19 This page has been left intentionally blank...