Pre-installation checklist
WARNING
The electrical power to the cooktop supply line must be shut off
while connections are being made. Failure to do so could result in serious injury
or death.
A. When preparing cooktop opening, make sure the inside of the cabinet and the
cooktop do not interfere with each other. (See section on preparing the
opening.)
B. Remove packaging materials and literature package from the cooktop before
beginning installation.
C. Remove installation instructions from literature pack and read them carefully
before you begin. Be sure to place all literature, user mannal, installations,
etc. in a safe place for future reference.
D. Make sure you have all the tools and materials you need before starting the
installation of the cooktop.
E. Your home must provide the adequate electrical service needed to safely and
properly use your cooktop. (Refer to section on electrical requirements.)
F. When installing your cooktop in your home, make sure all local codes and
ordinances are followed exactly as stated.
G. Make sure the wall coverings, countertop and cabinets around the cooktop can
withstand heat(up to 200°F(93°C)) generated by the cooktop.
Parts included
• Foam tape
• 2 Hold-down brackets
• 2 Thumbscrews
• Mounting template
Installation Instructions
Preparing the opening
• The following MINIMUM clearance dimensions must be maintained.
If a 30″ clearance between the cooking surface and overhead combustible
materials or metal cabinets cannot be maintained, a minimum clearance of 24″
is required and the underside of the cabinets above the cooktop must be
protected with not less than 1/4″-thick flame-retardant millboard covered with not
less than No. 28 MSG sheet steel, 0.015″-thick stainless steel, 0.024″-thick
aluminum, or 0.020″-thick copper.
www.gaslandchef.com
3330-A Marathon Ct Charleston, SC 29418
12
1 (844) 538-7890
Содержание Pro CH1212BS
Страница 2: ......
Страница 23: ......
Страница 24: ...www gaslandchef com 1 844 538 7890...
Страница 48: ...www gaslandchef com 1 844 538 7890...