
MDE-4864B Gasboy® 9820 Pump Interface Kits Installation Instructions · March 2022
Page 7
Installation of the Gasboy 9820 Pump Interface Kit
8
Feed the connector end of the cable into the round terminal bracket mounting hole at the
bottom-right of the chassis. Position the terminal block with the red wire in position 1. Secure
the terminal block using the #8-32 hardware.
Figure 4: Installing the Terminal Block
Chassis
Cable
#8-32 Hardware
9
Carefully route the cable and install the connector on P1 of the new I/F PC Board.
10
Return the chassis to the cabinet.
11
Reconnect all the wiring.
12
Connect the new field wiring to the new terminal block. For more information refer to
MDE-4567 9120K & 9820K Series AST Pumps Installation and Operation Manual
.
13
Turn on the MICRO and FEED circuit breakers.