11 SERVICE WORK ON THE CHASSIS
58
S05133-11
–
Mount and tighten screw
7
.
Guideline
Screw, top
steering stem
M8
20 Nm (14.8 lbf ft)
Loctite
®
243™
S05132-11
–
Using a plastic hammer, tap lightly on the upper triple clamp to
avoid stresses.
–
Tighten screws
8
.
Guideline
Screw, top triple
clamp
M8
20 Nm (14.8 lbf ft)
–
Secure the wiring harness with cable holder
9
on the left.
A00885-12
–
Position the brake caliper. Mount and tighten screws
bk
.
Guideline
Screw, front
brake caliper
M8
25 Nm (18.4 lbf ft)
Loctite
®
243™
–
Position the brake line and the clamp. Mount and tighten
screws
bl
.
Guideline
Screw, brake line
holder
EJOT
1.7 Nm (1.25 lbf ft)
Finishing work
–
Install front fender. (
–
Mount the handlebar cushion.
–
Install the start number plate. (
–
Install the front wheel.
–
Check that the wiring harness, throttle cables, and brake and clutch
lines can move freely and are routed correctly.
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
11.13
Checking the steering head bearing play
Warning
Danger of accidents
Incorrect steering head bearing play impairs the handling characteristic and damages com-
ponents.
–
Correct incorrect steering head bearing play immediately. (Your authorized GASGAS Motorcycles workshop will
be glad to help.)
Содержание MC 450F 2022
Страница 1: ...OWNER S MANUAL 2022 MC 450F EX 450F MC 450F TROY LEE DESIGNS Art no 3215055en...
Страница 2: ......
Страница 115: ...COOLING SYSTEM 15 113 Finishing work MC 450F TROY LEE DESIGNS Install the motor guard p 52...
Страница 157: ...3215055en 3215055en 11 2021 Stallhofnerstra e 3 5230 Mattighofen Austria http www gasgas com...