background image

A.

Factory reset means that all settings will be set as factory 
default.

B.

Enable or Disable support connection… means that 
support can have access to the wallbox over internet. 
TWIN need to be connected to internet.

C.

Chargecontroller card changed. 
Click here if you want to copy all old chargning history to 
the chargecontroller card.

D.

Available for charging means that the TWIN is activated.

E.

Not available for chargning mean that the TWIN is 
deactivated. *

F.

Schedule means that you can set periods when the 
TWINes should be activated. 
Choose wanted period and press Book. *, **

G.

Click on a period to delete it*

* N/A for older wallboxes
** Same schedule is valid for all connected boxes

B

C

A

E

F

G

D

Visible only after doubleclick on GARO logo

WEB INTERFACE

30

EN

Содержание TWIN

Страница 1: ...GARO TWIN Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 info garo se garo se Manual 380231 1 2 Assembly instructions End User Instruction EN GARO AB EN...

Страница 2: ...21 USER MANUAL 26 Normal use Charging 26 Resetting Conditioning of RCCB 26 WEB INTERFACE 27 Reset of wifi settings 27 Connect mobil tablet computer to GARO TWIN web interface 27 General information 27...

Страница 3: ...sensory or mental capacity or anyone lacking in experience or knowledge unless they are provided with supervision or prior instruction in how to use the equipment by the person responsible for their...

Страница 4: ...arging cable and the end of the charging cable should be periodically wiped with a clean dry cloth to remove accumulation of dirt and dust Be careful not to damage the circuit boards or components dur...

Страница 5: ...oltage drop figure 3 shows the needed ampere A for each TWIN model Note Due to high currents for a long time in the cable there is a high risk of voltage drop if the cable is under dimensioned which c...

Страница 6: ...A that the outlets can load charge for example TWIN11kW 16 16A 32A Dip switch SW1 is located in the center of left hand side of CC2 see figure 9 2xM6 2x M8xL20mm Nut Washer 3xM6 L12mm 2xM8 L20 2xM8 N...

Страница 7: ...ble to terminals L1 L3 N PE Note TWIN is equipped with double terminals that makes it easy to forward the supply cable to another TWIN see figure 9 7 Fill in the serial number in the Guarantee form Se...

Страница 8: ...e is visible This action confirms that the TWIN wifi module is working properly TWIN need to be powered on for around 15min before this action 11 Test the TWIN with a test instrument or test to charge...

Страница 9: ...for settings 1 1 ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF 3 3 3 3 3 3 3 2 2 2 2 2 2 2 1 1 1 1 1 1 1 16 A 20 A 25 A 32 A 40 A 50 A 63 A SW2 CC1 CC2 ON OFF 4 4 ON Fixed cable OFF Outlet 3 3 2 2...

Страница 10: ...abled The cable is connected to terminals on CC2 see picture 11 remote control Enable of the TWIN can be done in two ways 1 Enable by open circuit default from factory 2 Enable by closed circuit The s...

Страница 11: ...INSTALLATION OF STANDALONE TWIN Termination 6 8 Termination 5 8 Termination 7 9 Termination 10 12 figure 15 11 EN...

Страница 12: ...Modbus address 2 recommended 100 or 101 9600 baud no parity one stop bit Set SW2 Dip 1 3 CC2 to max available Ampere A see settings for max available Ampere from mains see figure 17 ON OFF ON OFF ON...

Страница 13: ...in the supply distribution box It is also possible to install a 2nd Modbus energy meter when you need to measure the consumed energy at more than one place TWIN master require an installed wifi module...

Страница 14: ...the first wallbox TWIN Master which controls the charging current per phase for the entire system in order to prevent the main fuses from tripping The Master TWIN in the grid needs to have a wifi modu...

Страница 15: ...ngs explanation of Dip 5 6 on SW1 CC2 SW1 CC2 SW1 CC2 SW1 CC2 SW1 CC2 ON OFF ON OFF ON OFF ON OFF 6 6 6 6 5 5 5 5 SLAVE SLAVE MASTER SLAVE End term End term SW1 CC2 SW1 CC2 ON OFF ON OFF MASTER 5 SLAV...

Страница 16: ...Assembly the RFID readers according figure 23 figure 26 Note Both DIP switches should set to ON on both RFID readers see picture 18 A wifi module needs to be installed to the Master TWIN Note RFID can...

Страница 17: ...25pcs TWIN can be installed in cluster via Data link twisted pair cable It is also possible to mix TWIN and GLB in data link cluster In that case the maximum is 50pcs charging points TWIN 2pcs GLB 1p...

Страница 18: ...N OFF 6 6 6 6 5 5 5 5 MASTER SLAVE SLAVE SLAVE End term End term Schematic image with TWIN Master placed in the center of the cluster INSTALLATION OF STANDALONE TWIN SW1 CC2 SW1 CC2 SW1 CC2 SW1 CC2 ON...

Страница 19: ...dtermination ON OFF 5 5 ON Master Mode OFF Slave mode 4 4 Remote enable input function ON default Open circuit OFF Closed circuit 3 3 2 2 Fuse value in mains cabinet see below table for settings 1 1 O...

Страница 20: ...660 377 206 Dimensional sketch M Bus information Connection of M Bus only for TWIN with M Bus energymeters Terminal 300 M Terminal 301 M 8 5 4x 570 1 385 0 4 89 5 0 4 130 90o figure 32 20 EN...

Страница 21: ...QA1 QA2 CC1 CC2 FB1 FB2 FC2 1 P 1 C F P2 X1 L1 N PE L3 L2 16 32A 16 32A SIGNAL PLINT Q1 Main Breaker 100A P1 Energymeter Left Outlet P2 Energymeter Right Outlet FB1 RCCB Left Outlet FB2 RCCB Right Out...

Страница 22: ...figure 34 22 EN...

Страница 23: ...figure 35 23 EN...

Страница 24: ...figure 36 24 EN...

Страница 25: ...figure 37 25 EN...

Страница 26: ...y the Dynamic Load Management DLM functions If the TWIN is equipped with outlets it is important to use correct charging cable For example if you want to use 32A from the TWIN you must use a 32A charg...

Страница 27: ...tallations Schedule functions Activate deactivate TWIN Individual report for each chargingpoint WEB INTERFACE WEB INTERFACE Connect mobil tablet computer to GARO TWIN web interface General information...

Страница 28: ...List of all different statues WEB INTERFACE 28 EN...

Страница 29: ...charging Schedule E An installed DLM meter is visible here Note it can take up to 5min before the DLM meter is visible after power on N A for older wallboxes F Car and text shows present status G In...

Страница 30: ...all old chargning history to the chargecontroller card D Available for charging means that the TWIN is activated E Not available for chargning mean that the TWIN is deactivated F Schedule means that...

Страница 31: ...yed with installed DLM meter B Click Refresh to search for connected wallboxes C Multiple connected wallboxes are shown in a list D Click Identify to start white blink and ticking sound from chosen wa...

Страница 32: ...gymeter Energy meter not installed is shown B Choose energy meter C TWIN with internal energymeter show energy consumption here D Choose consumption period E Choose wanted energymeter cluster installa...

Страница 33: ...g request to 8 8 8 8 via ICMP ping 85 11 39 104 www webel online se via ICMP ping TCP port 80 and TCP port 443 Make sure your router firewall does not block this traffic WPA WPA2 encryption is support...

Страница 34: ...Save after changed settings Ethernet settings A B C D You can connect the wallbox to a LAN via wifi modules ethernet port Make sure that your local network uses a secure firewall to avoid unwanted acc...

Страница 35: ...he RFID tag number from the wallbox By click Read tag from wallbox the RFID reader can read the tag number you hold in front of the reader D Add a referens to each tag E Choose selected a specific wal...

Страница 36: ...s A B Note only for standalone Master wallbox with outlet G Cloud G Cloud is a service for legal persons and require a subscription and internally energymeter in the wallbox The service means that the...

Страница 37: ...etting at 6A unless you experience problems starting your charging process C Slide the slider to wanted minimum charging current and click Save The function is not available for older TWIN Charge curr...

Страница 38: ...Power limit is neccessary tick the box and set the Powerlimit value wanted in the distribution board Note it is possible to monitor 2pcs distribution boards In this case settings needs to be done for...

Страница 39: ...for each wallbox in the system B Click Save after changed settings C Note in systems with multiple connected wallboxes make the setting for each box in the system All wallboxes are shown in a list C...

Страница 40: ...onnected wallboxes Note a TWIN update will take up to 5 min G Web interface By Computer Android mobile or tablet 1 Open https www webel online se wifi and download the file device must be connected to...

Страница 41: ...th white light Click the serialnumber Edit and name the wallbox according to your preferences Note space is not allowed Repeat step 2 and 3 until all wallboxes have a name 4 RFID SETTING Settings RFID...

Страница 42: ...error Solid purple light Chargebox overheating charging has stopped White fast flash Search light indication One quick white flash repeating every minute Indicate an error in DLM function Solid blue l...

Страница 43: ...Protection class IP44 Mechanical impact resistance IK10 Temperature range 25C 40C Weight 14 18kg depending on model Standard cable length fixed cable version Standard 4m Rated current withstand 10kA...

Отзывы: