Installing the Device in the Left Center Panel
You can use the included hardware to flush mount the device in the left center panel opening on a Freightliner
Cascadia vehicle.
1 Remove the dashboard front panel.
2 Secure the mount plate to the dashboard using the four screws from the vehicle compartment.
3 Secure the mount cover
to the mount plate using two of the included M3 screws .
4 Replace the dashboard front panel.
5 Place each bracket
on the dock , aligning the holes in the bracket with the holes on the dock.
6 Using the included M5 screws , secure each bracket to the dock.
You should apply a recommended torque of 5.0 to 6.0 lbf-in. (0.56 to 0.68 N-m) to the screws.
7 Connect all necessary cables to the device before placing it into the mount.
8 Place the device into the mount.
9 Secure the brackets to the mount cover using the included M3 screws .
11