ii
SECTION 4
SERVICE AND TESTING
4.1 MEMORY BATTERY REPLACEMENT..................................................................................23
4.2 FINAL TEST..........................................................................................................................24
4.2.1 Test Equipment Required............................................................................................24
4.2.2 Set-Up..........................................................................................................................25
4.2.3 Final Test Procedure....................................................................................................25
4.2.4 Comm Transceiver Alignment....................................................................................41
SECTION 5
ILLUSTRATED PARTS LIST
5.1
LIST OF REPLACEABLE PARTS.........................................................................................45
5.2
ASSEMBLY DRAWINGS.....................................................................................................46
LIST OF FIGURES
FIGURE 1
GNC 250/300 BLOCK DIAGRAM............................................................................3
FIGURE 2
CONTROL/DISPLAY UNIT BLOCK DIAGRAM.....................................................4
FIGURE 3
CPU BOARD BLOCK DIAGRAM.............................................................................5
FIGURE 4
RF/IF BLOCK DIAGRAM ........................................................................................7
FIGURE 5
COMMUNICATION TRANSCEIVER .....................................................................8
FIGURE 6
CPU BOARD TESTPOINTS (TOP VIEW)..............................................................12
FIGURE 7
CPU BOARD TEST POINTS (BOTTOM VIEW)....................................................13
FIGURE 8
COM RECEIVER TEST SETUP..............................................................................35
FIGURE 9
TRANSMITTER TEST SETUP...............................................................................39
FIGURE 10 J2 REAR CONNECTOR PINOUT DEFINITION..................................................43
FIGURE 11 J1 REAR CONNECTOR PINOUT DEFINITION..................................................44
FIGURE 12 GNC 250/300 ASSEMBLY DRAWING (VIEW 1).................................................47
FIGURE 13 GNC 250/300 ASSEMBLY DRAWING (VIEW 2).................................................48
FIGURE 14 GNC 250/300 ASSEMBLY DRAWING (VIEW 3).................................................49
FIGURE 15 GNC 250/300 ASSEMBLY DRAWING (VIEW 4).................................................50
FIGURE 16 GNC 250/300 ASSEMBLY DRAWING (VIEW 5)................................................51
FIGURE 15 GNC 250/300 CONNECTOR DIAGRAM ..............................................................52
Содержание GNC 250
Страница 6: ...3 Figure 1 GNC 250 300 Block Diagram...
Страница 15: ...12 Figure 6 CPU Board Testpoints Top View...
Страница 16: ...13 Figure 7 CPU Board Testpoints Bottom View...