190-02087-10
GDL 50(R)/51(R)/52(R) Installation Manual
Rev. 2
Page 3-6
3.10 Post Installation Checkout
An in-aircraft checkout may be performed in the aircraft on the ramp.
3.10.1 Power On Check
To turn on the GDL 5X, press and release the power button. Applying power to either the GDL 5X or
GDL 5XR will also turn the devices on. Verify that the Power LED stays illuminated green after the boot
sequence completes.
3.10.2 Connext Data Link Check
1. If a Connext connection is active, the Connext LED will be solid blue on the face of the
GDL 5X/5XR. See the applicable display Pilot's Guide to pair the display with the GDL 5X/5XR
or for configuring the serial port for wired connections.
2. Verify that any connected devices are receiving the proper information from the GDL 5X/5XR.
3. Verify, by using the display, that the configuration options in
Section 2.9
are set accordingly.
Содержание GDL 52
Страница 1: ...190 02087 10 August 2018 Revision 2 Data Link Installation Manual GDL 50 R 51 R 52 R ...
Страница 40: ...190 02087 10 GDL 50 R 51 R 52 R Installation Manual Rev 2 Page B 2 Figure B 2 GDL 5XR aera 660 79X GMA 24X R ...
Страница 41: ...190 02087 10 GDL 50 R 51 R 52 R Installation Manual Rev 2 Page B 3 Figure B 3 GDL 5XR GMA 24X R GDU 4XX ...