Installation
Apollo GX50/60/65 Installation Manual
25
P
OST
I
NSTALLATION
C
HECKOUT
Once the unit is installed, complete the checkout procedure to verify proper operation. Refer
to the User’s Guide for operating instructions.
The steps that are not applicable to a particular installation may be skipped. A checkout log
sheet is included on page 31 to fill out during the checkout procedure. Make a photocopy of
the log sheet for ease of use if desired.
The checkout procedure is broken into several groups. The GPS Navigation Checkout, VHF
Comm Checkout (GX60/65), and the Final System Check should be completed with the
aircraft moved clear of hangers and other structures.
Mounting / Wiring Check
Verify that all cables are properly secured and shields are connected to the rear of the
mounting frame. Check the movement of the aircraft controls to verify that there is no
interference.
T
EST
M
ODE
C
HECKOUT AND
S
ETUP
The GX50/60/65 has a built-in test mode to simplify the checkout. To operate the GX50/60/65
in the test mode, hold down the leftmost and rightmost “smart keys” while switching on the
power. To return to normal operation, switch the power off, then back on.
Avionics Outputs
Check the avionics output connections by using the test mode as follows. Rotate the
LARGE
knob to select each test.
1.
Using the “CDI
T
RIANGLE
” page, rotate the
SMALL
knob to check left, mid, and right.
2.
Using the “VDI
T
RIANGLE
” page, rotate the
SMALL
knob to check down, mid, and up.
3.
Using the “T
O
/F
ROM
F
LAG
” page, rotate the
SMALL
knob to check the Off, To, and From
outputs.
4.
Using the “L
AMP
O
UTPUTS
” page, rotate the
SMALL
knob to check all the connected
annunciators.
5.
Using the “V
ALID
F
LAG
P
AGES
” page, rotate the
SMALL
knob to check all the connected
valid flag outputs.
Installation Configuration
The GX50/60/65 must be configured to match the operation supported by the installation.
This includes IFR, VFR, approach, and Search and Rescue operation selections.
1.
In test mode, rotate the
LARGE
knob to the “I
NSTALL
O
PTIONS
” page.
2.
Press
SEL
. Rotate the
SMALL
knob to select IFR operation (Y
ES
or N
O
). Rotate the
LARGE
knob for APPR* selection. Rotate the
SMALL
knob to select approach operation (Y
ES
or
N
O
). Rotate the
LARGE
knob for SAR (Search and Rescue) selection. Rotate the
SMALL
knob to select SAR operation (Y
ES
or N
O
). Press
ENT
when complete. (Note: APPR can
only be set to Y
ES
when IFR is set to Y
ES
).
*
(GX50/60 only)
Note:
Make sure that all installation requirements are complete for the selected operation.
Refer to the System Configurations section on page 4 for installation requirements.
Содержание Apollo GX50
Страница 4: ...NOTES...
Страница 8: ...Table of Contents iv Apollo GX50 60 65 Installation Manual NOTES...
Страница 10: ...Introduction 2 Apollo GX50 60 65 Installation Manual Figure 1 GX50 Front Panel Figure 2 GX60 65 Front Panel...
Страница 21: ...Installation Apollo GX50 60 65 Installation Manual 13 Figure 4 Mounting Frame Assembly Figure 5 Cable Routing...
Страница 26: ...Installation 18 Apollo GX50 60 65 Installation Manual Figure 8 GX50 60 65 Power and Avionics Connections...
Страница 30: ...Installation 22 Apollo GX50 60 65 Installation Manual Figure 12 RS 232 Serial Connections...
Страница 31: ...Installation Apollo GX50 60 65 Installation Manual 23 Figure 13 GX60 65 Comm Wiring Diagram...
Страница 32: ...Installation 24 Apollo GX50 60 65 Installation Manual Figure 14 GX60 65 Typical Audio Panel Connections...
Страница 40: ...Installation 32 Apollo GX50 60 65 Installation Manual NOTES...
Страница 50: ...Limitations 42 Apollo GX50 60 65 Installation Manual NOTES...
Страница 54: ...Periodic Maintenance 46 Apollo GX50 60 65 Installation Manual NOTES...
Страница 82: ...Serial Interface Specifications 74 Apollo GX50 60 65 Installation Manual NOTES...
Страница 84: ...Full Stack Drawing 76 Apollo GX50 60 65 Installation Manual...
Страница 85: ......
Страница 86: ......