FGP Series Football Goal Posts   

 

12 

 
 

6.

 

Insert the plate and rod assembly into the concrete and work 
it down until the bottom of the plate is touching the concrete.  
Make sure the center of the plate is directly under the string 
line, square with the field, and the center of the plates is the 
correct distance behind the front of the end zone end line.  
5’-2 ¼” for the 4 ½” diameter post, 6’-2 ¾” for the 5 9/16” 
post. 

7.

 

Insert the four pieces of re-bar, item 8, vertically into the 
concrete about 4” out from the plate and 90º from each other.  
Work the bars down until they are approximately 3” below 
the surface of the concrete.  

8.

 

Smooth surface of concrete and allow to cure. 

9.

 

Concrete should cure for a minimum of 5 days before 
installing goal posts. 

 
 

After concrete has cured completely proceed with installing the post onto the base. 

 

1.

 

Install a ¾” flat washer, item 9.7 on each 
threaded rod. 

2.

 

Set post over the threaded rods being careful to 
not damage the exposed threads.  

3.

 

Install another ¾” flat washer, item 9.7 on each 
rod and then install a ¾” nut, item 9.9 on each 
rod. 

4.

 

Tighten all four nuts enough to make sure the 
post is firmly seated on the base. 

5.

 

Place a level on the post and check for plumb 
(check both directions). 

6.

 

If post requires adjustment to plumb, loosen the 
nuts and adjust the nuts under the post plate to 
raise the edge of the plate.  Tighten the top nuts 
and recheck for plumb.  Continue adjusting until 
the post is plumb. 

7.

 

Measure from the playing surface to the center 
of the open end of the pipe at the gooseneck.  The measurement taken should be 9’-9 
3/4”.  Adjust the height of the post to achieve the correct measurement by adjusting the 
nuts at the base of the post. 

8.

 

Once the post has been plumbed and adjusted to the correct vertical measurement, check 
the gooseneck alignment to the center of the field. 

9.

 

Rotate the gooseneck to make sure the horizontal portion of the gooseneck is accurately 
lined up with the centerline of the playing field. 

10.

 

Tighten all nuts securely to prevent movement of the post.

 

 

 

 
 

Содержание PSS FGP400 Series

Страница 1: ...GP400 and FGP600 series Installation and Maintenance Instructions Please read all instructions before attempting installation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION NO Revis...

Страница 2: ...aimer 3 Parts Checklist 4 Tools Required 6 Preparation for Installation 7 Post Installation Permanent Mount 8 Post Installation with Ground Sleeves 9 Post Installation Plate Mount 11 Crossbar Installa...

Страница 3: ...up of the Football Goal Post No one under the age of 18 should attempt assembly or set up of the unit unless properly supervised To prevent normal wear and tear from shortening the life of the unit p...

Страница 4: ...RE FGP401S AND FGP402S 1 1 155752640 KIT HARDWARE FGP601S AND FGP602S 1 1 101152132 THREADED ROD 1 2 13 X 10 LG 1 1 945751724 THREADED ROD 3 4 DIA X 12 1 2 LONG 1 1 9 2 502 8 13 60 HEX BOLT 1 2 13 UNC...

Страница 5: ...4 4 4 502 8 13 88 HEX BOLT 1 2 13 UNC X 5 5 1 1 502 8 13 104 HEX BOLT 1 2 13 UNC X 6 5 1 1 9 4 502 8 13 96 HEX BOLT 1 2 13 UNC X 6 2 2 2 2 9 5 511 6 16 8Z SET SCREW CUP POINT 3 8 16 UNC X 0 5 Z 4 4 4...

Страница 6: ...IA X 12 1 2 LONG 1 541 8 13 HEX NUT 1 2 13 10 541 12 10 HEX NUT 3 4 10 10 945752124 TUBE GROUND SLEEVE 4 1 2 POST 1 945751723 TUBE GROUND SLEEVE 5 9 16 POST 1 Note Quantities shown are for one sleeve...

Страница 7: ...or 602 series goals 5 9 16 diameter posts the center of the hole must be 6 2 3 4 behind the front of the end zone end line as shown above 2 Dig hole as shown in Figure 1 Figure 2 or Figure 3 dependin...

Страница 8: ...s on each end of the field dug for the sleeve mounts 2 Add 6 of gravel to the bottom of the hole 3 Insert a drainage tube approximately 8 10 long in the center of each 4 Install one the threaded rods...

Страница 9: ...ires a permanent mounted post or plate mounted post proceed to the appropriate section 1 Stretch a string the length of the field centered on the playing field This string should be over the center of...

Страница 10: ...ctions 5 If post requires adjustment to plumb remove the post from the sleeve and loosen the nuts on the threaded rods Tighten one of the nuts on one side of the threaded rod to shift the rod to the s...

Страница 11: ...nd of the field dug for the post mounts 2 Add 6 of gravel to the bottom of each hole 3 Install a nut item 9 7 onto each anchor rod item 6 Screw the nut onto the rod 4 Make sure 4 of thread is exposed...

Страница 12: ...s being careful to not damage the exposed threads 3 Install another flat washer item 9 7 on each rod and then install a nut item 9 9 on each rod 4 Tighten all four nuts enough to make sure the post is...

Страница 13: ...he crossbar in the post until it is level 8 Install the two setscrews item 9 6 and tighten securely 9 Recheck crossbar for level and recheck alignment to the end zone end line 10 Using the hole on the...

Страница 14: ...he upright to the vertical position and snug the two setscrews item 9 6 in the bracket 6 Using a level adjust the upright for plumb 7 When the upright is plumb tighten both setscrews securely item 9 6...

Страница 15: ...tween yearly inspections 2 It is recommended that yearly inspections be conducted to determine if any bolts or other hardware has become worn or loosened 3 During yearly inspections check all joints t...

Страница 16: ...ed Holdings LLC Performance Sports Systems Gared Sports 9200 E 146th Street 9200 E 146th Street Noblesville IN 46060 Noblesville IN 46060 800 848 8034 800 325 2682 www perfsports com www garedsports c...

Отзывы: