
13-21-603 Page 90
MAINTENANCE SCHEDULE
Maintenance Action
As Indicated
by AirSmart
Controller
Every 8
Hours
Every
125
Hours
Every
1000
Hours
Every
8000 *
Hours
Every
Year
Change Air Filter ...................................................
·
Change Oil Separator ...........................................
·
Check Reservoir Oil Level .....................................
·
Check for Proper Load/Unload ...............................
·
Check Discharge Pressure/Temp ...........................
·
Check Dirt Accumulation on Cooler ........................
·
Change Oil Filter Element ......................................
·
·
Change Compressor Lubricant (AEON 9000 SP) * .
·
·
Check Relief Valve ................................................
·
* See Oil Change Interval Chart,
Figure 5-7
, page 74, for specific lubricant life.
Содержание EBM99M 60
Страница 12: ...13 21 603 Page 11 Figure 1 4 COMPRESSOR MOTOR SIDE Figure 1 5 COOLER RESERVOIR SIDE 217ECM797 A Ref Drawing...
Страница 13: ...13 21 603 Page 12 Figure 1 6 AIR OIL FLOW DIAGRAM 219ECM797 A Ref Drawing...
Страница 61: ...13 21 603 Page 60 WIRING DIAGRAM FULL VOLT AIR COOLED WATER COOLED 575 VOLT 315EAM546 B Ref Drawing Page 2 of 2...
Страница 69: ...13 21 603 Page 68 Figure 5 3 FLOW DIAGRAM AIR OIL SYSTEM 221ECM797 B Ref Drawing...
Страница 95: ......