43
STEP 7: Attach the Pipe
1. Connect the oil inlet pipe (#26) to the connector Z 1/2"-M14*1.5 (#60)..
2. Connect the oil return pipe (#78) to the oil return connector of beam.
3. Connect the oil pipe (#62) to the gear pump (#58) tighten with clamp (#61).
STEP 8: Attach the Log Cradle
1. Attach the log cradle (#11) to the beam using hex bolt M10x25 (#82) and nylon lock nut M10
(#17).
Содержание GFBHT65-12TBS950
Страница 2: ...2 Vitesse de remorquage max 8 Km h USAGE FORESTIER UNIQUEMENT Max towing speed 8 km h FOREST USE ONLY...
Страница 3: ...3 FR FENDEUSE DE B CHE 12 TONNES GFBHT65 12TBS950 Mode d emploi et Instructions d utilisation...
Страница 27: ...27 Sch mas et liste des composants...
Страница 31: ...31 GB 12 TONNE LOG SPLITTER GFBHT65 12TBS950 OPERATOR S ORIGINAL INSTRUCTIONS...
Страница 54: ...54 Parts Drawing Parts List...