L11A
4
L11C
12
L12A
10
Y6
12
PART
NO
QTY
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
2
1
42
L11A
L11A
L12A
L12A
L12A
L12A
L12A
L11C
L11C
L11C
L11C
L11C
L11C
Y6
Y6
Slide all Y6 glazing panels into place. The top of the panels should be pushed up behind
the gutter profile, then pushed in against the base profile as shown in the detail drawings.
The panels should be loosely retained by the glazing bar capping L11A, L11C and L12A then
tap the bar capping gently into the channels of each frame profile with a rubber mallet.
Содержание GM34404
Страница 1: ...Assembly Instructions...
Страница 45: ...Y7 Y7 Y7 Y9 Y9 Y7 Y7 Y7 Y9 Y9 43 Y7 Y7 4 Y9 8 Y7 PART NO QTY...