Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
2
1
37
L11A
L11C
L11C
L11C
L11C
L11C
L12A
L12A
L12A
L12A
L11A
Y6
Y6
Y6
Y6
Y6
Slide all Y6 glazing panels into place. The top of the panels should be pushed up behind
the gutter profile, then pushed in against the base profile as shown in the detail drawings.
The panels should be loosely retained by the glazing bar capping L11A, L11C and L12A then
tap the bar capping gently into the channels of each frame profile with a rubber mallet.
L11A
4
L11C
10
L12A
8
Y6
10
PART
NO
QTY
Содержание GM34303
Страница 1: ...Assembly Instructions...
Страница 40: ...Y7 Y7 Y7 Y9 Y9 Y7 Y7 Y7 Y9 Y9 38 Y7 Y7 Y7 Y9 Y9 4 Y9 6 Y7 PART NO QTY...