Fig 1
Fig 2
Fig 4
Fig 3
Step2:
1.
Connect all 5pcs of Beams (A) and 1pc of Beam with Screw Holder (B) to Beam Hub (K). Use
1pc M6x15 Screw (Z) to secure each beam to Beam Hub (K), as shown in Fig.1 & Fig.2
2.
This step requires 2 people to lift the Roof structure
onto the circle structure. Have one hold
the roof structure and the other person
attach the bott
oms of Beams (A) and Beam with
Screw Holder (B) to the top of Post
Holder (O), using M6x45 Screw (Z1).
Refer to
Fig.3
3.
Connect Magne
ti
c Plate (Z5) with the inner part of Cambered
R
ail (C) right below the Beam
with Screw Holder (B) using M6x8 Screws (Z3).
Refer to
Fig.4
Step 2
A
Z
K
K
Z
B
A
A
B
A
O
B
A
O
O
C
3
Z
5
Z
1
Z
4